Similar Projects
Hardwood Synthetic Sports Flooring
Post-Bid

Miramar`s Regional Park Aquatics Rest Room and Break Room Flooring Project
Post-Bid
Miramar, FL 33027

Fire Stations No. 3 and 6 Flooring
Alteration
Results
Plantation, FL 33325

Sunset Lakes Community Center Flooring Project
Post-Bid
Miramar, FL 33029

56--ACFT Artificial Turf Field
Post-Bid
Miramar, FL

Fire Station Apparatus Bay Floor Resurfacing
Post-Bid
Sunrise, FL 33326

WWTP Process Area Floor Coating Project
Post-Bid
Miramar, FL 33025

CoverTec Surfacing Protective System
Post-Bid
Plantation, FL

Floor Resurfacing Project For Fire Stations
Post-Bid
$70,000 est. value
Pembroke Pines, FL

Multi-Service Center LVT Flooring Installation
Alteration
Post-Bid
Miramar, FL 33023

Miramar Youth Enrichmentcenter and Vizcaya Park Supervisor Office Flooring Project
Alteration
Post-Bid
Miramar, FL 33023

Vizcaya Park Office Area, Concession Area and Break Room Flooring Project
Alteration
Post-Bid
Miramar, FL 33029

Maintenance of Hardwood Floors
Term Contract
Post-Bid
FL

Vizcaya Park Lobby Flooring Project
Alteration
Post-Bid
Miramar, FL 33029

Vinyl Composition Tiles (VCT) for Fiveash WTP
Alteration
Post-Bid
Fort Lauderdale, FL

Reported 12/08/2021 12:00 AM
Project Title

Fire Station 15 Bay Floor Restoration

Physical Address View project details and contacts
City, State (County) Tamarac, FL 33321   (Broward County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $46,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Repair and Renovation required for Fire Station 15 Bay Floor and locker room and wash area. The bay floor is approximately 5,000 square feet and the locker room wash area includes hallway entrances, hose tower, locker room area and wash area (all rooms included) approximately 700 square feet. Work includes grinding all epoxy flooring in apparatus bay; apply moisture vapor barrier primer coat to eliminate moisture drive through the slab; reapply double broadcast quartz epoxy flooring and urethane striping; and restriping of yellow lines for vehicle parking.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents