Similar Projects
Mille Lacs Band of Ojibwe District III Head Start
New Construction, Infrastructure - 5,557 SF
Bidding
$1,300,000 CJ est. value
Hinckley, MN 55037

City Parking Lot Reconstruction
Infrastructure
Bidding
$300,000 CJ est. value
Cambridge, MN 55008

Webster Educations Center Renovation
Renovation
Sub-Bidding
$8,000,000 CJ est. value
Grove City, MN 56243

Gravel Crushing
Term Contract
Sub-Bidding
Foley, MN 56329

South Kawishiwi Pavilion Ramp Construction and Log Repair
Infrastructure, Renovation
Post-Bid
$100,000 CJ est. value
Ely, MN 55731

South Kawishiwi Pavilion Ramp Construction and Log Repair
Infrastructure, Renovation
Post-Bid
$100,000 CJ est. value
Ely, MN 55731

Concrete Pavement Rehabilitation, Bituminous Surfacing
Results
MN

Concrete Rehabilitation, Bituminous Milling
Alteration
Results
MN

SPPS Jie Ming Mandarin Immersion Part 3 BP #3
Renovation
Construction
$3,000,000 CJ est. value
Saint Paul, MN 55116

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 Earthwork, Utilities, Building Demolition
Infrastructure - 20,000 SF
Construction
$1,086,550 CJ est. value
Saint Paul, MN 55116

Airport Utilities Extension and Grading
Infrastructure
Bidding
$400,000 CJ est. value
Grand Rapids, MN 55744

As-Needed Concrete and Masonry Services
Term Contract
Post-Bid
MN

2022 Random Concrete Repairs
Infrastructure, Alteration
Results
Saint Louis Park, MN

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

2022 Miscellaneous Concrete Work
Alteration
Results
Faribault, MN

Last Updated 04/13/2023 05:31 AM
Project Title

2023 Street Improvements

Physical Address View project details and contacts
City, State (County) Byron, MN 55920   (Olmsted County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from Civil Engineer - 03/22/23
Owner View project details and contacts
Architect View project details and contacts
Description

ADA Curb Ramps, Paving (Asphalt or Concrete), Asphalt Pulverizing, Sidewalks/Curbs/Gutters, Street/Road Asphalt Resurfacing and Milling, Sitework/Excavating and Grading The project scope consists of milling and overlaying or reclaiming and paving the streets as designated on the plans in Byron, MN. New concrete walk will be constructed along both sides of the streets designated as reclaim and pave and new pedestrian ramps will be constructed at all the designated street intersections shown on the plans. Site Directions: Highway 14 west from Rochester to 2nd Avenue NW in Byron, then right on to 2nd Avenue NW to 4th Street NW, then left on to 4th Street NW to 9th Street NW, then right onto 9th Street NW The extent of the work involved is furnishing all labor and materials for construction of the 2023 Street Improvements together with related subsidiary and incidental work including: The project consists of 14,325 SY of reclamation of the existing pavement, 4,165 to bituminous pavement, 31,365 SF of 4" concrete walk, 1,910 SF of 6" concrete walk, and 1,190 LF concrete curb & gutter. The method of construction shall be by Contract and all work is to be done in strict compliance with plans and specifications prepared by WHKS & Co., 2905 South Broadway, Rochester, Minnesota 55904 which have heretofore been approved by the City Council and are now on file for public examination in the office of the City Administrator.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents