Similar Projects
Salt Lake City New Water Reclamation Facility Project
Post-Bid
$350,000,000 to $400,000,000 est. value
Salt Lake City, UT

Ashley Springs Water Treatment Plant Expansion Project
Renovation
Post-Bid
Vernal, UT

Welby Canal Drum Screen
Results
$50,000 to $60,000 est. value
Bluffdale, UT 84065

Rushton Groundwater Treatment Plant General and Electrical Contractor Prequalification
Results
West Valley City, UT 84119

New Water Reclamation Facility (WRF) Project Liquid Train 1
New Construction
Post-Bid
Salt Lake City, UT 84116

Construction of the Water Treatment Plant Chain and Flight and Wastewater Treatment Plant Nutrient Upgrades Project
New Construction
Results
Price, UT

Greendale Water Treatment Plant Upgrades
Renovation
Post-Bid
Manila, UT

20B Rushton Groundwater Treatment Plant
Renovation
Results
$9,300,000 est. value
West Valley City, UT 84119

Construction of the Caineville SSD Water Treatment Plan
New Construction
Post-Bid
Richfield, UT

Pwtp Sanitary Survey Related Improvements
Renovation
Results
Salt Lake City, UT 84104

Water Treatment Plant Equipment Manufactures/Suppliers
Renovation, Term Contract
Post-Bid
East Carbon, UT

City Creek Treatment Plant Upgrades
Renovation
Results
$2,316,000 est. value
Salt Lake City, UT 84103

Little Cottonwood Water Treatment Plant - Standby Generator Equipment Infrastructure Project
Addition, Infrastructure
Post-Bid
Sandy, UT 84093

Wastewater Treatment Plan Reconstruction
Renovation
Post-Bid
Morgan, UT 84050

Orem Water Reclamation Facility Tertiary Reuse Project
New Construction
Post-Bid
Orem, UT 84058

Reported 06/29/2022 12:00 AM
Project Title

Phase II Bioreactor Expansion and UV Disinfection Project

Physical Address View project details and contacts
City, State (County) Midvale, Ogden, UT 84404 (Salt Lake, Weber Counties)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Adding secondary treatment capacity by adding new aeration basin(s) and two new secondary clarifiers. A new UV building retrofitted on top of an existing chlorine contact basin and change from chlorine gas to sodium hypochlorite. Project also includes all civil improvements, yard piping, site grading and landscaping. Additional highlights of the project include a new influent pump and blower with mechanical and electrical improvements.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents