Similar Projects
Lake Michigan Water System
Infrastructure
Design
$592,000,000 to $810,000,000 est. value
Joliet, IL

Contract No. 1 - Customer Water Meter Replacement
Infrastructure
Bidding
Morrison, IL

Construction project in the Sunnyside Neighborhood off of Cottage Grove Avenue
Infrastructure
Bidding
Ford Heights, IL

Water Main Valve Exercising
Term Contract
Post-Bid
Orland Park, IL

Purchase and Delivery of Fire Hydrant(S), Auxilary Valve(S), and Accessories
Post-Bid
Des Plaines, IL

Water System Improvements
Results
Ludlow, IL 60949

Private Utility Improvements Holland Street
Results
Washington, IL 61571

Pana PAC Building
New Construction
Bidding
$1,000,000 est. value
Pana, IL

Lions Park Water Main Replacement
Post-Bid
Mount Prospect, IL

Reedwood Phase 1A Water Main Improvements
Results
Less than $850,000 est. value
Joliet, IL 60436

North Galena Avenue Watermain Lining
Infrastructure
Bidding
Dixon, IL 61021

Purchase of Potable Water Meters
Post-Bid
Schaumburg, IL

Florence Park Phase 1A Water Main Improvements
Results
Joliet, IL 60433

Herrick House Lift Station and Force Main Rehabilitation
Renovation, Infrastructure
Bidding
Bartlett, IL

Elizabeth Street and Appletree Court Water Main Improvements
Post-Bid
Yorkville, IL 60560

Last Updated 03/29/2022 04:32 PM
Project Title

Main Street Alley Water Main Improvements

Physical Address View project details and contacts
City, State (County) Ladd, IL 61329   (Bureau County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $935,682
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes replacement of the water main within the alley east of Main Street from Cleveland Street to the Railroad. From the alley, water main will run west to the west side of IL-89 along the railroad. Water main will cross the railroad on the east side of IL-89 and head north to tie into the existing water main. Approximately 2,800 linear feet of 8” water main will be installed. The project includes jacking and boring of steel casings under IL-89 and under the railroad. The alley will be fully resurfaced with Hot Mix Asphalt and sewers will be replaced where necessary to meet IEPA requirements.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents