Similar Projects
Pflugerville Water Pipeline Project
New Construction, Infrastructure
Conception
$86,000,000 est. value
Pflugerville, TX

Williamson Creek - Richmond Tributary Rehabilitation
Infrastructure
Conception
Less than $4,200,000 est. value
Austin, TX

George Washington Carver Museum Cultural and Genealogy Center Phase 2A Site Utilities
Renovation, Addition, Build-Out, Infrastructure
Design
$5,100,000 est. value
Austin, TX 78702

Waterloo Greenway - Creek Delta
New Construction, Infrastructure - 630,728 SF
Design
$55,000,000 est. value
Austin, TX 78701

Zilker Water and Wastewater Pipeline Renewal: Treadwell St. Area REBID
Infrastructure
Bidding
$8,600,000 CJ est. value
Austin, TX 78701

Zilker Water and Wastewater Pipeline Renewal: Treadwell St. Area REBID
Infrastructure
Bidding
$8,600,000 CJ est. value
Austin, TX 78701

2022 Drainage Maintenance
Term Contract
Sub-Bidding
Volente, TX 78641

FM 973 - Crack Seal
Infrastructure
Sub-Bidding
$118,005 CJ est. value
Austin, TX 78725

Parmer Village Multi-Family Apartment - Building 1 and Sitework
New Construction
Post-Bid
Austin, TX 78753

Water, Wastewater, Drainage and Paving Improvements for Bryson Phase 5 Section 1 and Bryson Phase 6, Public Improvement Construction Plans
Post-Bid
Leander, TX

Redevelopment of 1215 Red River and 606 East 12th Streets
Results
Austin, TX 78701

Apache Shores Improvement Red Fox Waterline 1
Results
$495,000 est. value
Austin, TX 73301

Burnet Road Office Building
New Construction, Infrastructure - 180,000 SF
Construction
$28,088,000 CJ est. value
Austin, TX 78756

QuikTrip #4190 / Manor
New Construction, Infrastructure - 4,993 SF
Pending Verification
$475,000 CJ est. value
Manor, TX 78653

5th and Walsh-Shell Office Building
New Construction, Infrastructure - 204,000 SF
Pending Verification
$60,996,099 CJ est. value
Austin, TX 78703

Last Updated 08/02/2022 11:13 AM
Project Title

Construction of Crosswinds Subdivision, Phase 3B

Physical Address View project details and contacts
City, State (County) Austin, TX 78701   (Travis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of Streets, Drainage, Water, Wastewater and Erosion Control Improvements. Any proposal lacking the Pre-Qualification Statement will not be considered. All questions, clarifications, requests must be received in writing to Quynn Dusek, P.E. via email to quynn@cbdeng.com and received no later than noon, Monday, June 27, 2022. Any requests received after that time and date will not be addressed. A Cashier s Check, Certified Check, or Bid Bond payable to Crosswinds M.U.D. and Development Solutions CW, LLC in an amount not less than 5% of the total bid must accompany each Bid as a guarantee that, if awarded the contract, the bidder will within 10 days of the award of the contract, enter into a contract and furnish an acceptable Performance and Payment Bond in the amount of 100% of the Contract price. The Bidder s surety will be forfeited and become the property of the Owner should the bidder fails to enter into a contract and furnish bonds acceptable to the Owner within 10 days after award of the contract. Proposals shall not be withdrawn for a period of 90 days after the opening of the bids. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. The Successful Bidder, if any, will be the responsible Bidder which in the Owner s judgment will be most advantageous to the District and result in the best and most economical completion of the Project. A Maintenance Bond will be required and is to remain in force for a period set by the governing requirements from the date of the letter of final acceptance from City of Kyle, Hays County and the Crosswinds MUD.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents