Similar Projects
Animal Shelter Re-Roof
Post-Bid
Harrisville, UT 84404

First Step Housing Roofing Project
Renovation
Post-Bid
Salt Lake City, UT

Corinne and Jack Sweet Library Roof Replacement
Results
Salt Lake City, UT 84103

Public Library System - Day-Riverside Branch Roof Replacement Project
Results
Salt Lake City, UT 84116

Millcreek Residential Roof Replacement
Post-Bid
Millcreek, UT

Roof Drainage Replacement - Eccles Institute of Human Genetics
Results
$20,000 to $30,000 est. value
Salt Lake City, UT 84112

Re-Roofing of Pavilion at Nielsen`s Grove Park
Post-Bid
Orem, UT 84058

Replacement of the Sand Hollow Aquatics Center Arch-Supported Tensile Fabric Roof Membrane
Results
Saint George, UT 84770

Oak City Roof Replacement
Renovation - 38,500 SF
Post-Bid
Oak City, UT

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Roofing Contractors
Post-Bid
Saint George, UT 84770

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

North Ogden 1, 5, 21 Seismic Re-Roof
Renovation
Post-Bid
North Ogden, UT 84414

Roof Replacement and Flooring Replacement
Results
Provo, UT

Box Elder Middle School Partial Re-Roof
Post-Bid
Perry, UT 84302

Last Updated 04/30/2020 09:46 AM
Project Title

Lind Lecture Hall Roof Replacement Weber State University

Physical Address View project details and contacts
City, State (County) Ogden, UT 84403   (Weber County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description/Base Bid: New roof system assembly shall consist of (from bottom to top): Existing steel structural deck or concrete deck. Insulation assembly including tapered insulation to direct water to roof drains and tapered crickets where indicated on the Drawings.The roof system replacement scope consists of removal of existing roof systems where indicated on the drawings and where all low-slope membrane roofs exist on the building. ½” cover board. Fully adhered PVC roof membrane. Replacement roof system is to consist of a new fully-adhered PVC roof system with associated prepainted and PVC coated metal flashings over a polyisocyanurate insulation assembly of minimum R-30 insulation above-deck. New metal flashings, copings, edge metals, etc. to match existing materials/finish.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents