Similar Projects
Alyssum and Twinflower Storm Line Replacement - City of Forest Grove
Infrastructure
Conception
$300,000 est. value
Forest Grove, OR 97116

Park Place Bridgeport Mixed Use / Tualatin
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

Westbrooke Estates Mixed Use
New Construction, Infrastructure - 9,800 SF
Design
$55,000,000 CJ est. value
Hillsboro, OR 97123

Fanno Creek Trail: Woodard Park-Bonita Road/85th Avenue-Tualatin Bridge
Infrastructure
Design
$5,980,000 CJ est. value
Tigard, OR 97223

Ash Drive Pavement Repair
Infrastructure
Bidding
$240,000 CJ est. value
Tigard, OR 97223

Ash Drive Pavement Repair
Infrastructure
Bidding
$240,000 CJ est. value
Tigard, OR 97223

South West 209th Avenue Kinnaman Road to Alexander Street 36-Inch PVC Pipe
Infrastructure
Post-Bid
$150,000 to $200,000 est. value
Aloha, OR 97007

Water Transmission Pipeline
Infrastructure
Post-Bid
$15,000,000 to $20,000,000 est. value
Sherwood, OR 97140

North Pipeline Lateral N1 Relocation at NorthWest Martin Road and Highway 47 for Tualatin Valley Irrigation District
Infrastructure
Results
$25,000 to $100,000 est. value
Forest Grove, OR 97116

Aloha INN PSH Civil Work
Infrastructure
Results
$65,000 est. value
Hillsboro, OR

Century Boulevard/TV Highway Intersection #100294 - Washington County
Infrastructure
Construction
$3,691,800 CJ est. value
Hillsboro, OR 97123

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Cedarbrook of Tigard Senior Living
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Portland, OR 97223

Encompass Health Inpatient Rehabilitation Hospital / Hillboro
New Construction, Infrastructure
Conception
$36,000,000 CJ est. value
Hillsboro, OR 97124

OR8: SW Hocken Avenue - SW Short Street
Infrastructure
Design
$7,901,395 CJ est. value
Beaverton, OR 97005

Last Updated 02/16/2023 07:03 PM
Project Title

SW Wilson Ct Kimberly Hart Waterline Replacement

Physical Address View project details and contacts
City, State (County) Beaverton, OR 97008   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $783,228 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

DESCRIPTION OF PROJECT. The City of Beaverton is accepting will only accept electronic bids for the project, SW Wilson Ct (Kimberly - Hart) Waterline Replacement, Project No. 3980-23. The project consists of the installation of approximately 797 lineal feet of 6" diameter, 569 lineal feet of 8" diameter, and 440 lineal feet of 12" diameter new water main, with 33 water services, 3 hydrants, 1 CARV, and associated valves and structures. The project cost is approximately between $1,000,000 and $1,300,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PREVAILING WAGES. The contract expected to be awarded in connection with this solicitation is subject to the state prevailing wage rates under ORS 279C.800 to 279C.875 and/or the federal prevailing wage rates under the Davis-Bacon Act (40 U.S.C. 3141 et seq.). No Bid will be received or considered by the City unless the Bid contains a statement by the Bidder that "Bidder agrees to be bound by and will comply with the provisions of ORS 279C.838, ORS 279C.840 or 40 U.S.C. 3141 to 3148." For more information regarding this project contact Marisa Cummins, Project Manager, at 503-729-4742 RESIDENT BIDDER. The Bid must identify whether the Bidder is a "resident bidder," as defined in ORS 279A.120. 2. LICENSING. The City will not receive or consider a Bid unless the Bidder is duly licensed by the Construction Contractors Board or the State Landscape Contractors Board. 3. NON-CONFORMING TERMS OR CONDITIONS. A Bidder may not make its Bid contingent on the City's acceptance of any terms or conditions (including specifications) other than those contained in this Solicitation Document. 4. ASBESTOS. Based on currently-known information, this project is not an "asbestos abatement project" in that the project does not entail the demolition, renovation, repair, construction, or maintenance activity of any public or private facility that involves the repair, enclosure, encapsulation, removal, salvage, handling, or disposal of any material with the potential of releasing asbestos fibers from asbestos-containing material into the air NONDISCRIMINATION. The City extends equal opportunity to all persons and specifically encourages firms certified by Certification Office of Business Inclusion & Diversity (COBID) to access and participate in this and all City projects, programs and services. All Bids must certify that the Bidder has not discriminated and will not discriminate against a firm certified by COBID in awarding a subcontract.Certification of non-discrimination in accordance with ORS 279A.110 (4), by signing the "Bid Certification" form. The City may reject a Bid that does not comply with all of City's requirements in the Solicitation Document or with prescribed public contracting procedures and requirements, including the requirement that the Bidder demonstrates the Bidder's responsibility under ORS 279C.372(3)(b). The City may also reject for good cause all Bids after finding that doing so is in the public interest.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents