Similar Projects
CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Gladys Drive and Vicinity Main Replacement
Infrastructure
Bidding
$5,150,000 est. value
Pleasant Hill, CA

2022 Bijou 2/3 Waterline Replacement Project
Infrastructure
Bidding
$2,165,707 est. value
South Lake Tahoe, CA

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Professional Engineering Services For Water System Improvements In Madera County Maintenance District No. 36 Eastin Arcola
Infrastructure
Post-Bid
Madera, CA

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

RAS Pipe Rehabilitation Project
Infrastructure
Bidding
Redwood City, CA 94065

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

AC Water & Sewer Group 1052
Infrastructure
Bidding
$14,610,000 est. value
San Diego, CA 92101

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Pure Water Program (PWP) Morena Conveyance South & Middle and Morena Conveyance Bike Lanes
Infrastructure
Bidding
$116,300,000 est. value
San Diego, CA 92101

Reported 02/04/2022 12:00 AM
Project Title

Design of Otay 2nd Pipeline St Replacement Ph 5

Physical Address View project details and contacts
City, State (County) San Diego, CA 92101   (San Diego County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $200,000 to $2,500,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Project consists of the installation and abandonment of water transmission pipeline from the north terminus on 55th St and Seifert Street, to the south terminus on 60th Street near Tooley Street and will consist of: Installing approximately 5,568 linear feet (1.05 miles) of 42” CMLC pipe via open trench. Installing approximately 350 LF 42” CMLC pipe via trenchless crossing SR94. Abandoning approximately 5,369 LF (1.02 miles) of existing 36- inch and 42-inch steel pipe. Installing check valve at Federal Bl and 60th St when the proposed pipe has been installed at 60th St

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents