Similar Projects
Grease Trap Cleaning Services
Post-Bid
Peoria, AZ

Wastewater Collection System Rehabilitation
Post-Bid
Guadalupe, AZ

Professional Services for Loop 101 and Loop 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Loop 101 & 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Construction of Sun City Festival Ranch Infrastructure Sewer for Parcel E2
Post-Bid
Buckeye, AZ

Wastewater Sampling and Flow Monitoring Equipment
Term Contract
Results
Tempe, AZ

CMAR Services for Chandler Heights Road Utility Relocations
Infrastructure
Post-Bid
Chandler, AZ 85226

Wastewater Collection System Emergency Repair and Replacement
Results
Phoenix, AZ 85003

Ocotillo Road Improvements - 148Th To Greenfield
Term Contract, Infrastructure
Post-Bid
$1,474,900 est. value
Gilbert, AZ

PD Main Sanitary Sewer and Landscape Improvements
Results
$145,546 est. value
Mesa, AZ 85211

Installation of Sewer Service Lines
Infrastructure
Post-Bid
Fountain Hills, AZ

Relief Sewer Project Van Buren And 52nd Street
Results
Phoenix, AZ 85003

Construction Manager at Risk (CMAR) Services for Dobson Road and Chandler Boulevard Intersection Sewer Improvements
Infrastructure
Post-Bid
$3,000,000 to $4,000,000 est. value
Chandler, AZ 85224

General Utility Projects Job Order Contract
Results
Gilbert, AZ

Offsite Sewer Installation
Infrastructure
Post-Bid
Phoenix, AZ 85043

Reported 04/29/2022 12:00 AM
Project Title

US-93 Sewer Relocation Project

Physical Address View project details and contacts
City, State (County) Wickenburg, AZ   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction work, in general, consists of the replacement and relocation of approximately 800 linear feet of 12-inch diameter gravity sewer line, along US-93, near Rincon Road; and other incidental work. The project generally consists of the removal of 800 linear feet of 12-inch diameter vitrified clay pipe and ductile iron pipe and replacing and relocating with new PVC 12-inch diameter sewer pipe and includes the addition of 55-feet of steel casing pipe. Additionally, the project will include the removal and replacement of up to two manholes, and up to three service lateral connections.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents