Similar Projects
New Riverside Park / Barn Site - 00085 - Town of Bluffton
Infrastructure
Conception
$3,872,112 CJ est. value
Bluffton, SC 29909

Desai Hotel / Beaufort
New Construction, Infrastructure - 3,600 SF
Design
$30,000,000 est. value
Beaufort, SC

Desai Hotel / Beaufort
New Construction, Infrastructure - 3,600 SF
Design
$30,000,000 est. value
Beaufort, SC

Gravel Parking Lot and Challenge Course at Law Enforcement Center
Infrastructure, Renovation
Bidding
$450,000 CJ est. value
Bluffton, SC 29910

Gravel Parking Lot and Challenge Course at Law Enforcement Center
Infrastructure, Renovation
Bidding
$450,000 CJ est. value
Bluffton, SC 29910

Evergreen Regional Pond
Post-Bid
Bluffton, SC 29910

Cross Island Parkway (US 278) Toll Conversion Design-Build Project
Post-Bid
SC

Road Resurfacing Year 4 Projects - Asphalt Rejuvenator
Results
Beaufort, SC

Us-278 Flyover Roadway Drainage Outfall Erosion Improvements
Infrastructure
Results
Beaufort, SC

Pine Court Apartments
New Construction, Infrastructure
Construction
$6,000,000 CJ est. value
Beaufort, SC 29902

Pine Court Apartments
New Construction, Infrastructure
Construction
$6,000,000 CJ est. value
Beaufort, SC 29902

Washington Square East
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Bluffton, SC 29910

Washington Square East
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Bluffton, SC 29910

Spanish Wells Office Warehouse
New Construction, Infrastructure - 6,593 SF
Design
$800,000 CJ est. value
Hilton Head Island, SC 29926

P458 Laurel Bay Fire Station
New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Beaufort, SC 29902

Last Updated 09/26/2022 02:07 PM
Project Title

Buck Island Road Drainage Improvements - 00100 - Town of Bluffton

Physical Address View project details and contacts
City, State (County) Bluffton, SC 29910   (Beaufort County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $87,500 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 26 2022, bid is under evaluation. No schedule for the work has yet been established *The previous solicitation is listed below for reference. Phase I of project consists of drainage infrastructure improvements by upgrading two existing roadway culverts crossing Buck Island Road to improve drainage and reduce risk of flooding and roadway overtopping. The project will consist of construction of existing design and permitted improvements to replace existing culverts with new, larger culverts to increase flow capacity. Construction will include removal of existing culverts, new culvert crossing installation, channel improvements, maintenance of traffic, erosion and sediment control and appurtenances. Phase II of project will evaluate the entire drainage area to identify other potential areas of drainage improvement, design and construction of identified improvements. This project is in included in the Town of Bluffton FY 2022-2026 Capital Improvement Plan (CIP).

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents