Similar Projects
HVAC Replacement - Dunbar Erwin Elementary School
Alteration
Bidding
$300,000 est. value
Newport News, VA 23607

HVAC and Mechanical Products
Term Contract
Post-Bid

LINAC AHU Construction
Post-Bid
$400,000 to $1,500,000 est. value
Newport News, VA

Hiden Hussey/Commons Dining Hall Select Roof and HVAC Replacement
Results
$200,000 to $299,999 est. value
Newport News, VA

HVAC Replacement for Kiln Creek Elementary School
Results
$200,000 to $299,999 est. value
Newport News, VA 23602

Air Purification Systems
Post-Bid
Chatham, Pound, Victoria, VA 23936

HVAC Replacement - Telecommunications Building
Results
Newport News, VA 23606

Armstrong SF665DW Heater Replacement Parts
Post-Bid

HVAC Replacement - Gatewood PEEP
Results
Newport News, VA 23601

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Preventive Maintenance and On-Call Services
Term Contract
Results
Altavista, Bedford, Covington, Lynchburg, Newport News, Onancock, Winchester, Wytheville, VA 24523

HVAC Automation and Maintenance Services
Alteration
Post-Bid
Newport News, VA 23602

HVAC Preventive Maintenance and On-Call Services
Term Contract
Results
Emporia, Farmville, Newport News, Norfolk, Onancock, South Hill, Williamsburg, VA 23185

BAF Maintenance
Term Contract
Post-Bid
Fort Eustis, VA

Building Control Unit Removal and Installation
Alteration
Results
Newport News, VA 23602

Last Updated 05/04/2022 06:06 AM
Project Title

HVAC Replacement - An Achievable Dream Middle/High School

Physical Address View project details and contacts
City, State (County) Newport News, VA 23605   (Newport News City County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. The demolition of packaged roof top heating, ventilating and air conditioning units. Removal of classroom unit ventilators, hot water heating systems including piping, boilers, pumps and associates hydronic accessories. Removal of roof mounted relief hoods and replacement of general exhaust fans. 2. Provide new packaged rooftop heat pump air conditioning units with hot water auxiliary heat. Provisions for (3) new dedicated outdoor air rooftop units and associated roof curbs. Classroom vertical unit ventilators, condenser water system with associated cooling tower, plate and frame heat exchanger, pumps, boilers and hydronic accessories. Cap open outlets where relief hoods were demolished. Provisions for new general exhaust fans. 3. Provide new building automatic temperature controls system. 4. Provisions for new ceilings in select locations, replacement of tile where indicated. 5. Structural work related to the replacement of and installation of new rooftop units as indicated. 6. Electrical work associated with the replacement of HVAC equipment, and provisions for a new emergency generator.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents