Similar Projects
ComEd Vault Ventilation (Construction)
Infrastructure
Design
$100,000 to $250,000 est. value
Chicago, IL 60612

RFP - HVAC Repair and Maintenance Services
Term Contract
Bidding
Chicago, IL 60616

Boilers 3, 4, 5 and MCC Replacement Stickney Water Reclamation Plant Rebid
Renovation
Bidding
$17,825,000 CJ est. value
Cicero, IL 60804

Boiler Water Treatment Program
Term Contract
Sub-Bidding
Chicago, IL 60604

Riverside Brookfield High School Air Handling Unit Replacement
Renovation
Sub-Bidding
$2,000,000 CJ est. value
N Riverside, IL 60546

Central Community Center - RTU Replacement (Units 6, 8, 11)
Alteration
Post-Bid
Mount Prospect, IL 60056

Evergreen Park Public Library - HVAC Replacement
Alteration
Post-Bid
Evergreen Park, IL 60805

Y1da--537-18-142 Replace Failed S10c AHU for Vascular, SCM, and Urology Construction
Results
$1,000,000 to $2,000,000 est. value
Chicago, IL 60612

Des Plaines HVAC Improvements
Results
Des Plaines, IL

HVAC Replacement Work - Gymnasium at Thornton Fractional South High School
Renovation
Sub-Bidding
$400,000 CJ est. value
Lansing, IL 60438

Weatherization (IHWAP) Program
Term Contract
Post-Bid

Morton College Building E - HVAC
Renovation
Results
Less than $100,000 est. value
Cicero, IL 60804

Cooling Replacement for Existing AHU (Air Handling Unit) , Oak Park and River Forest High School
Renovation
Sub-Bidding
$500,000 CJ est. value
Oak Park, IL 60302

HVAC Replacement and Toilet Room Remodeling
Renovation, Alteration
Post-Bid
Norridge, IL 60706

J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Results
Hines, IL 60141

Last Updated 01/26/2023 11:34 AM
Project Title

Chiller Plant Replacement Project Maine East High School

Physical Address View project details and contacts
City, State (County) Park Ridge, IL 60068   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from MEP Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Chiller Plant Replacement Project Maine East High School A ten percent (10%) bid security will be required with the bid. Bid security amount will be on the lump sum Base Bid price only. Bidder may submit bid security as a bid bond, certified check or cashier's check made payable to the Owner as a guarantee that if the Bid is accepted, a Contract will be entered into, and the performance of the Contract is properly secured. Bidding contractor must be able to perform a minimum of fifty percent (50%) of proposed work with their directly employed force. Successful Bidder will be required to furnish to Owner Performance and Labor and Material Bonds in the sum equal to one hundred percent (100%) of the amount of the Bid, with sureties to be approved by owner. The Contractor shall be required to furnish sufficient insurance of guarantee of indemnity to the Owner, Engineer and Engineer's Consultant(s) against any and all claims which might arise for damages to persons or property due to the negligence of himself, his employees or agents during the construction of said improvements and until the said improvement has been finally accepted as complete by the Owner. Bidder's lump sum price shall be based on using not less than the prevailing hourly wage rate determined by the Illinois Department of Labor and complying with the Illinois Equal Employment Opportunity laws. The Owner reserves the right to accept or reject any and all bids, to waive any irregularities or informalities in the bidding documents or procedures and to award the contract to a Bidder which best serves the interest of the Owner. Maine Township High School District 207 will receive sealed bids for the Chiller Plant Replacement Project - at the District Office on Wednesday, January 25, 2023, at 1:00 PM local time. The modification work is a single lump sum bid. The work will include, but not be limited to the following: Replacement of existing gas absorption chillers with electric chillers he proposed work for the Chiller Plant Replacement Project is as follows: Chiller Plant Replacement Project: (Maine East High School) Scope of work involves all work associated with extending the existing chilled water piping to connect to the current chiller system located within the boiler room

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents