Similar Projects
SH0044 - Flexible Base
Bidding
$210,000 est. value
TX

Brawner Parkway - Carroll Lane to Kostoryz Road (Bond 2018)
Bidding
Corpus Christi, TX 78473

Roadway Rehabilitation Projects CR 67, CR, 69, CR 77 and Bauer Road
Post-Bid
TX

Roadway Rehabilitation Projects
Post-Bid
Corpus Christi, TX 78401

Southern Region Disaster Recovery Support BPA
Results

Park Road 22 Bridge Bond 2004 (Re-Bid)
Results
Less than $12,580,000 est. value
Corpus Christi, TX 78469

Paving/Concrete
Term Contract
Bidding
Corpus Christi, TX

Roadway Rehabilitation Projects - County Road 22 and County Road 49, Project
Post-Bid
Corpus Christi, TX 78415

Street Preventative Maintenance Program (Spmp) FY 2019 - 18135A
Results
Corpus Christi, TX

Bear Lane Bus Parking Lot Improvements
Post-Bid
Corpus Christi, TX 78416

North Padre Island Beach Access Road - Newport Pass Rd and Zahn Rd (Bond 2014) H17013
Results
Corpus Christi, TX 78401

Concrete Paving at Wiggins Cottages
Post-Bid
Corpus Christi, TX

FY2020 Crack Seal CC Area Office
Results
Less than $132,260 est. value
TX

Corpus Christi District Office C - ADA Accessibility
Post-Bid
Corpus Christi, TX 78416

Modify Exit Ramp to I69e/FM624 Direct Connector
Results
Less than $6,437,301 est. value
TX

Last Updated 04/23/2020 10:20 AM
Project Title

Lipes Boulevard - Yorktown to Sunwood (Bond 2018)

Physical Address View project details and contacts
City, State (County) Corpus Christi, TX   (Nueces County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope consists of improvements to approximately 2,900 feet of Lipes Blvd. with a new collector roadway located in a residential neighborhood, including curb and gutter, as well as ADA-compliant sidewalks and ramps. About half of the sidewalk and curb and gutter are to remain in place. Utility improvements include minor storm water improvements and rehabilitation of wastewater manholes.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents