Similar Projects
Filter Replacement Services at PHA Properties
Post-Bid
Saint Paul, MN

HVAC and Mechanical Products
Term Contract
Post-Bid

Johnson High School HVAC Replacement
Results
Saint Paul, MN 55106

HVAC Services for All MCES Locations
Results
MN

HVAC Systems Operation & Preventive Maintenance Services
Term Contract
Post-Bid
Saint Paul, MN

Multiple HVAC Equipment Replacement Units
Results
Saint Paul, MN 55119

Hatchery Compressor Replacement
Renovation, Demolition
Post-Bid
Saint Paul, MN

Data Room Cooling at the Judicial Building
Results
$103,036 est. value
MN

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Furnace Replacements at McDonough Homes
Results
$2,200 to $3,000 est. value
Saint Paul, MN 55117

HVAC Systems and Related Services
Alteration
Post-Bid

Como Hoof Stock Geothermal Mechanical Installation at Como Zoo Barn
Alteration
Results
Saint Paul, MN 55103

Roof and Condensing Unit Replacement
Alteration
Results
Saint Paul, MN 55104

Onsite Liebert A/C Maintenance, Repair, and Supply Contract
Term Contract
Results
Saint Paul, MN 55103

Replace AHU 3 and 4 Fans at Minnesota Judicial Center
Alteration
Results
Saint Paul, MN 55101

Last Updated 12/02/2021 04:43 PM
Project Title

Improve Cooling Tower at BCA - Maryland Facility

Physical Address View project details and contacts
City, State (County) Saint Paul, MN 55106   (Ramsey County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. The work will done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1.) All engineering, equipment, labor and permits required to satisfactorily complete the following improvements related to the cooling tower media upgrades and access platform construction at the BCA – Maryland facility. Access platform repairs and new work include construction of a new lower platform to access the cooling tower equipment, construction of new stair and platform at mid-level equipment and panels, replacement of steel posts supporting upper platform, and sandblasting of steel beams at base of structure. Cooling tower media upgrades include replacement of fill media, sealing all seams and pans for weather-tight enclosure, installation of gaskets at piping connections, installation of basin sweep system, and installation of BAS controls integrated into existing chiller controls.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents