Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

Main Street Improvements Phase II
Post-Bid
$1 to $311,500 est. value
Stoutsville, OH 43154

Lincoln Avenue Improvements
Post-Bid
$1 to $287,800 est. value
Pleasantville, OH

East Fair Avenue Improvement
Results
Less than $494,458 est. value
Lancaster, OH 43130

2021 Street Improvement Program - Paving
Results
Less than $1,425,000 est. value
Lancaster, OH

Basil Western Road Mixed Use Development
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Canal Whchstr, OH 43110

Basil Western Road Mixed Use Development
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Canal Whchstr, OH 43110

Timbertop Subdivision Phase 2
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Lancaster, OH 43130

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Lancaster Street Paving
Results
$182,349 est. value
Millersport, OH 43046

Dollar General / Lancaster
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Lancaster, OH 43130

SR 158 - Roadway Minor Rehab
Infrastructure
Design
$3,912,632 CJ est. value
Baltimore, OH 43105

Kirby, Halderman, and Dunford Street Improvements Project
Post-Bid
$249,500 est. value
Amanda, OH 43102

2021 Pickerington Pavement Maintenance Project
Results
$1,400,487 est. value
Pickerington, OH

Last Updated 08/29/2022 09:25 AM
Project Title

High St. - Paving Project

Physical Address View project details and contacts
City, State (County) Carroll, OH 43112   (Fairfield County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $169,409 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Scope the Project Work Shall Consist of Resurfacing High St. And Related Appurtenances and Equipment, Including All Labor, Materials and Equipment Necessary to Complete the Construction in Accordance With the Contract Documents. Each Bid Shall Be Accompanied by a Bid Guaranty and Contract Bond as Required by Section 153.54 of the Ohio Revised Code in an Amount Equal to the Sum of the Bid Submitted by Each Contractor. In Lieu of Posting the Bond, a Bidder May Use a Cashier's Check, Certified Check or Letter of Credit for Ten Percent of the Contractor's Bid as Bid Security. When a Check or Letter of Credit Is Used, the Bidder Shall Be Required to Post a 100 Percent Performance Bond and a 100 Percent Labor and Material Payment Bond, Upon the Signing of the Contract. Prevailing Wage the Contractor and All Subcontractors Shall Pay Employees on the Project the Prevailing Wages Established by the Ohio Department of Commerce Division of Industrial Compliance's Bureau of Wage and Hour Administration, Including All Updates, and Shall Comply With the Provisions of Chapter 4115 of the Ohio Revised Code. The Current Prevailing Wage Rate Schedule Is Bound in the Project Manual. The Village of Carroll Reserves the Right to Reject Any and All Bids, and the Right to Accept the Lowest and Best Bid, the Right to Waiver Minor Irregularities on Any Bid, and the Right to Accept the Bid Proposal Which Promotes the Best Interest of the Village of Carroll. Failure to Submit the Bid Guaranty Bond and the Required Two Notarized Affidavits With the Bid Shall Be Cause for Considering the Bid Submission Incomplete and for the Rejection of the Bid. Each Bid Must Contain the Full Name of the Party or Parties Submitting the Bid and All Persons Interested Therein. Each Bidder Must Submit Evidence of Its Experiences on Projects of Similar Size and Complexity. The Owner Intends and Requires That This Project Be Completed No Later Than 10/01/22. All Contractors and Subcontractors Involved With the Project Will, to the Extent Practicable Use Ohio Products, Materials, Services, and Labor in the Implementation of Their Project.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents