Similar Projects
Juniper Hill Commons
New Construction, Renovation
Conception
Harrisonburg, VA 22801

Manakin Towne Center
New Construction, Demolition - 164,000 SF
Conception
$100,000,000 est. value
Manakin, VA 23103

Cedera - Age Restricted Community
New Construction
Design
Chesapeake, VA

Construction Sentara Park
New Construction
Bidding
Harrisonburg, VA 22801

Thomas Jefferson Park Upper Field Turf Conversion
Infrastructure
Bidding
Arlington, VA 22204

Widewater State Park - Complete Phase 1 Development
Post-Bid
Stafford, VA 22554

Resurface Track - Dick Price Stadium
Post-Bid
Norfolk, VA

Upton Hill Regional Park - Site Renovations and Parking Expansion
Results
$850,000 est. value
Arlington, VA 22205

Charles Barrett Playground Renovation
Results
Alexandria, VA

Preston Lake Luxury Apartments
New Construction
Construction
Harrisonburg, VA

The Waypoint at Fairlington
New Construction, Renovation - 137,212 SF
Construction
$10,000,000 est. value
Alexandria, VA 22302

Residential Shelter
New Construction, Renovation - 8,836 SF
Conception
Max Meadows, VA 24360

Tennis Court Reconstruction Bennett's Creek Park
New Construction
Bidding
Suffolk, VA 23435

Hand-In-Hand Playground Project
Post-Bid
$850,000 est. value
Blacksburg, VA

Tennis Court Crack Repair
Results
Newport News, VA 23606

Last Updated 07/12/2021 11:28 AM
Project Title

Rockingham Park Pavilion II

Physical Address View project details and contacts
City, State (County) Penn Laird, VA   (Rockingham County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Dimension- 30’ x 48’ x 9’ 2. Metal roof with gutters 3. Enclosed soffit ceiling with 3 fans 4. Concrete pad 34’ x 52’ with a 4 inch slab 5. Sloped on exterior perimeter to allow water to run off the pad 6. Rockingham County will assist with the Contractor in final landscaping (grading, seeding, etc.) around the construction site. 7. Topsoil/excavated soil can be moved to an onsite area in close proximity to the construction site

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents