Similar Projects
Garden Cemetery - Phase 5 - City of Chelsea
New Construction, Infrastructure
Conception
$450,000 est. value
Chelsea, MA 02150

Steinert Hall Renovations
Renovation, Infrastructure
Conception
$6,000,000 CJ est. value
Boston, MA 02130

Harvard University Enterprise Research Campus
New Construction, Infrastructure - 61,500 SF
Design
$1,000,000,000 CJ est. value
Boston, MA 02134

Neponset Wharf
New Construction, Infrastructure - 38,400 SF
Design
$90,000,000 CJ est. value
Boston, MA 02122

727 Massachusetts Avenue Hotel Addition
Addition, Demolition, Renovation, Infrastructure - 51,250 SF
Post-Bid
$20,000,000 CJ est. value
Boston, MA 02203

Duct Bank Relocation Acceleration, On Call, Boston and Cambridge
Infrastructure
Post-Bid
$7,820,033 CJ est. value
Boston, MA 02203

Miscellaneous Site Improvements at Faneuil Development
Infrastructure
Results
$252,280 est. value
Boston, MA 02283

Remote Headworks Shaft Access Improvements - General Bid
Renovation
Results
$2,408,888 CJ est. value
Boston, MA 02203

NEXUS at the Allston Innovation Corridor
New Construction, Infrastructure
Construction
$100,000,000 CJ est. value
Boston, MA 02134

515-519 E. 2nd Street Residential Development
New Construction, Infrastructure
Construction
$13,000,000 CJ est. value
Boston, MA 02127

Residences at Readville Station
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Boston, MA 02136

Soldiers Field Road Residential Development
New Construction, Infrastructure - 14,500 SF
Pending Verification
$198,000,000 CJ est. value
Boston, MA 02135

Bowdoin Street Mixed-Use Development
New Construction, Infrastructure - 54,300 SF
Conception
$10,251,500 CJ est. value
Dorchester Center, MA 02124

High Street Residential Development
New Construction, Infrastructure - 30,444 SF
Design
$4,207,243 CJ est. value
Boston, MA 02122

Gas Protection System Replacement, Phase II, Deer Island Treatment Plant
Renovation
Post-Bid
$4,350,000 est. value
Winthrop, MA 02152

Last Updated 05/11/2023 03:28 PM
Project Title

Deer Island Treatment Plant Clarifier Rehabilitation, Phase II

Physical Address View project details and contacts
City, State (County) Winthrop, MA 02152   (Suffolk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $289,232,290 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 11, 2023, this project is under construction. A Notice to Proceed was issued March 10, 2023. All trades have been let. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents