Similar Projects
Vancouver Innovation Center Master Plan
New Construction, Renovation, Infrastructure
Conception
Vancouver, WA 98683

SR 500, NE 162nd Avenue to Leadbetter Road Paving
Renovation, Infrastructure
Bidding
$3,000,000 to $4,000,000 est. value
Vancouver, WA 98682

Terminal 2 - Berths 3/4 Upland Paving Project
Infrastructure
Bidding
$1,030,130 to $1,259,050 est. value
Vancouver, WA 98660

N 6th St/ N 8th St Concrete Pavement Repair Project
Infrastructure
Post-Bid
Washougal, WA 98671

Asphalt Overlay and Court Paint Resurfacing of the Pickeball Court
Infrastructure
Post-Bid
Washougal, WA 98671

Pavement Repair and Manhole Adjustment 2021
Alteration
Results
WA

Royle Road S 19th to 460 LF N of S 15th
Infrastructure
Results
$2,350,000 est. value
Ridgefield, WA 98642

2022 Central Curb Ramps
Infrastructure
Post-Bid
$600,000 est. value
Vancouver, WA

SR 14, I-205 to SE 164th Avenue Auxiliary Lanes
Infrastructure
Results
$20,000,000 est. value
WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

NE 99th Street - NE 94th Avenue to Vicinity of NE 117th Avenue
Infrastructure
Results
$16,894,000 to $19,710,000 est. value
Vancouver, WA 98687

I-405, NE 85th Street Interchange and Inline BRT Station Project
Term Contract
Post-Bid
$210,000 est. value

E 5th Street & NPS Parking Improvements
Infrastructure
Results
Vancouver, WA 98687

Hazel Dell Avenue Water Quality Retrofit
Infrastructure
Post-Bid
$250,000 to $310,000 est. value
Vancouver, WA 98665

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Last Updated 05/16/2022 03:43 AM
Project Title

SR 500, NE 182nd Ave Intersection Improvements

Physical Address View project details and contacts
City, State (County) Vancouver, WA   (Clark County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,250,000 to $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Constructing a compact roundabout at the intersection of SR 500 and NE 182nd Ave, full-depth pavement rebuild, grind and hot mix asphalt (HMA) inlay, HMA overlay, pigmented cement concrete pavement, curbing, guardrail, drainage, striping, new illumination system including new junction boxes, conduit, wiring, signing, channelization modifications throughout the project and other work. County : Clark County.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents