Similar Projects
City Hall Offices & Plaza
New Construction
Design
Kenosha, WI 53140

Lions and Biwer Park Improvements
Bidding
New Berlin, WI

Lions Park Playground
Bidding
New Berlin, WI

Don Almquist Playground Reconstruction
Post-Bid
Greenfield, WI 53220

Playground Equipment for 2 (Two) City Parks
Post-Bid
Less than $48,000 est. value
Green Bay, WI 54302

Playground Replacements at Sunny Valley and Hunter's Ridge Parks
Results
Less than $90,000 est. value
Sun Prairie, WI 53590

Burton Park Playground Surfacing
Results
$75,000 est. value
Hudson, WI 54016

The Boneyard
New Construction - 2,400 SF
Construction
$500,000 to $1,000,000 CJ est. value
Madison, WI

Apostle Islands Area Campground Expansion
New Construction
Pending Verification
Bayfield, Red Cliff, WI

Somersville Residential Development
New Construction - 9,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Kenosha, Somers, WI 53144

Birkinbine, Grandview, Reserve and West Prairie Village Parks Playground Project
Bidding
$280,000 est. value
Sun Prairie, WI 53590

Veterans Memorial Field South Softball Field Site Redevelopment
Post-Bid
Portage, WI 53901

2021 Tennis Court Rehabilitation at Neenah High School
Results
Neenah, WI 54956

Veterans Memorial Park - West Parkway, Honor Plaza, and Trail Expansion
New Construction
Bidding
Bristol, WI

Claflin Park Restoration and Riprap Installation
Post-Bid
Sturgeon Bay, WI

Reported 03/10/2021 12:00 AM
Project Title

Removal and Installation – Bucholtz Park Ball Diamond Lighting

Physical Address View project details and contacts
City, State (County) Clintonville, WI 54929   (Waupaca County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The existing poles, fixtures, breaker panel to be removed and replaced. The system is to be upgraded to LED lighting. A. Install a new breaker panel and new breakers with a set of maintenance outlets near panel. B. Wood poles are to measure 60’ above ground. C. If needed, we will need the proper underground wiring buried to each pole from the source. D. Proper brackets and hardware to be installed on poles to mount LED light fixtures. E. Installation of the LED lighting based off lighting calculations provided by contractor (the lighting should be based off of the Little League standards, 50-foot candles in the infield and 30-foot candles in the outfield). F. Restore the disturbed areas of turf, backfill and reseed with straw/grass seed.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents