Similar Projects
Bland Tract Subdivision
New Construction, Infrastructure
Conception
$55,000,000 CJ est. value
Statesboro, GA 30461

Replace Water Main on West Main Street - WWD-14-W - City of Statesboro
Infrastructure
Conception
$500,000 CJ est. value
Statesboro, GA 30458

Veterans Memorial Parkway Multi-Residential Development
New Construction, Infrastructure
Design
$40,000,000 CJ est. value
Statesboro, GA 30458

Milling, Inlay and Plant Mix Resurfacing on SR 67
Infrastructure
Bidding
$4,000,000 CJ est. value
Statesboro, GA 30458

Milling, Inlay and Plant Mix Resurfacing on SR 67
Infrastructure
Bidding
$4,000,000 CJ est. value
Statesboro, GA 30458

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Stillwell Street and Zetterower Avenue Intersection Improvements
Infrastructure
Post-Bid
Statesboro, GA 30458

Miller Street Extension and Colfax Station Road Maintenance Upgrades Project
Results
Statesboro, GA 30458

2021 LMIG Project
Results
Mount Vernon, GA

Bland Avenue Drainage Improvements - STM-42 - City of Statesboro
Infrastructure
Conception
$250,000 CJ est. value
Statesboro, GA 30458

Natural Gas - Aspen
Infrastructure
Bidding
$200,000 CJ est. value
Statesboro, GA 30458

FedEx
Infrastructure
Post-Bid
Statesboro, GA 30458

Blue Mile Utility and Streetscape Phase 1
Results
$3,956,569 est. value
Statesboro, GA

Chandler Road Near Olympic Boulevard Culvert Replacement - STM-40 - City of Statesboro
Infrastructure
Conception
$1,500,000 CJ est. value
Statesboro, GA 30458

Sanitary Sewer Rehabilitation
Infrastructure
Bidding
$800,000 CJ est. value
Statesboro, GA 30458

Last Updated 09/27/2022 12:05 PM
Project Title

East Jones Avenue Sidewalk from South Main Street to South Zetterower Avenue

Physical Address View project details and contacts
City, State (County) Statesboro, GA 30458   (Bulloch County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected March 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 27, 2022 a design consultant has been selected. *The previous solicitation is listed below for reference. Request for Proposal ENG - 122h: East Jones Avenue Sidewalk from South Main Street to South Zetterower Avenue The City of Statesboro Engineering Department is requesting for proposals, engineering design services for improvements to East Jones Avenue from South Main Street to South Zetterower Avenue. This project will consist of a 5' sidewalk from S. Zetterower Ave. to S. Main St. This will be the final section of sidewalk to complete the sidewalk along the entire length of Jones Avenue from Johnson St. to Gentilly Dr. This project will include any drainage infrastructure, easements, and property acquisition needed to install the sidewalk. Project is included City of Social Circle FY2021/22 - FY25/26 Capital Improvement Plan CIP. If you have any questions, please contact Darren Prather at 912-764-0642 or darren.prather@statesboroga.gov PROJECT LIMITS AND OVERVIEW The project includes any drainage infrastructure, easements, and property acquisition needed to install the sidewalk. The design task involves locating the existing right-of-way and designing a sidewalk profile to allow for a 5' sidewalk that extends approximately 1500 feet, terminating at South Zetterower Avenue. Additionally, a culvert underneath East Jones will need to be extended, with the headwall aligned to the new sidewalk. A hydrology study and hydraulic calculations for the culvert extension will be required. A typical City roadway pavement section is to be used. A site location map is attached for your reference. SCOPE OF SERVICES Design plans shall be in Georgia Department of Transportation format and all design shall be in accordance with the latest AASHTO, MUTCD and Georgia Department of Transportation Standards and Specifications. Erosion control plans shall be in accordance with latest NPDES and Georgia EPD requirements. All survey of existing conditions shall be done on state plane coordinates. The plan set shall consist of cover, notes, quantities, plan and profile with cross-sections at 50 foot intervals, utility plans, erosion and sediment control plans, details, and right-of-way plans. The proposal shall include project approach of design, staking of any required right-of-way and easements. Preparation of right-of-way plans and documents shall also be included as part of this proposal. The proposal shall include a construction cost estimate to be used for bid tabulation. The format shall be MS excel spreadsheet. Upon the City of Statesboro's acceptance of the completed plans, the consultant shall provide an electronic copy of files and drawings in AutoCAD format.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents