Similar Projects
Whipple Road Tennis Expansion - REC00030 - Town of Mount Pleasant
Renovation, Infrastructure
Conception
$2,607,000 CJ est. value
Mount Pleasant, SC 29464

Jubilee Hall - Hampton Park Renovation
Renovation
Design
$5,000,000 CJ est. value
Charleston, SC 29403

Downtown Building Renovation/ New Performing Arts Center
Renovation
Design
$5,000,000 CJ est. value
North Myrtle Beach, SC 29582

Community Pavilion Project
New Construction
Post-Bid
Less than $190,000 est. value
Chester, SC 29706

Richland-Regional Skeet/Trap Event Range - Site
Renovation
Post-Bid
$2,400,000 to $2,900,000 est. value
Eastover, SC 29044

Creative Arts City Park
Results
North Charleston, SC

P405 Design-Bid-Build, Range Improvements & Modernization, Phase 3, Marine Corps Recruit Depot, Parris Island, South Carolina
Results
$2,500,000 to $100,000,000 est. value
Parris Island, SC

Landrum Farmers Market Pavilion
New Construction - 8,006 SF
Construction
Landrum, SC

Southern Commons
New Construction, Infrastructure
Design
$65,000,000 CJ est. value
Cayce, SC 29172

Brewer Community Center Restroom Renovations
Renovation
Post-Bid
Greenwood, SC 29646

Site Work And Renovations At The J. C. Boozer Recreation Complex
Renovation
Results
$750,000 est. value
Greenwood, Ninety Six, SC 29666

Detention Center Outdoor Recreation Cover
Renovation
Post-Bid
Barnwell, SC

Gaffney High School Baseball/Softball Batting Cage
Results
Gaffney, SC 29341

Maintenance and Repairs to Adventure II
Renovation
Post-Bid
Charleston, SC 29407

Anderson Recreation Complex Expansion - Phase III
Renovation
Results
$6,000,000 est. value
Anderson, SC 29625

Last Updated 09/26/2022 12:04 PM
Project Title

Bathroom Remodel at Donnelly Wildlife Management Area (WMA)

Physical Address View project details and contacts
City, State (County) Green Pond, SC 29446   (Colleton County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $34,580 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Awardee: Madco Contracting & Consulting for $34,580.23 1. Demo all three bathrooms (remove vanities, toilets, shower/tub, and flooring). 2. Replace any drywall and patch where needed or if damaged during demo. 3. Install 3 new Dreamline QWALL-5 White 32-in x 48-in x 77-in base/wall alcove shower kit, or equivalent in price and quality. 4. Install new Pfister Bronson Tuscan Bronze 1-handle shower facet in all three showers, or equivalent in price and quality. 5. Install 2 new Ellenbee 48-in gray single sink bathroom vanity with white cultured marble top in both upstairs bathrooms, and one Ellenbee 36-in gray single sink bathroom vanity with white cultured marble top in downstairs bathroom, or equivalent in price and quality. Vanities shall be outfitted with Pfister auden Tuscan bronze 2-handle widespread watersense bathroom sink faucet with drain, or equivalent in price and quality. 6. Install Dreamwalls 36-in W x 36-in H square beveled frameless lighted wall mirrors, or equivalent in price and quality, over each sink with vanity. Install allen + roth wyatt modern farmhouse vanity 3-light bronze farmhouse vanity light, or equivalent in price and quality, above each mirror and vanity in all three bathrooms. Contractor responsible for any additional/change in wiring necessary. 7. Install new toilets in each bathroom. Must be Kohler highline white elongated chair height 2-piece watersense toilet 12-in rough in size (ADA compliant), or equivalent in price and quality, in all three bathrooms. 8. Install new pex plumbing to all fixtures (from wall studs to fixtures). 9. Paint all walls in paint provided by SCDNR. 10. Install and paint new trim in white. 11. Remove and replace any subfloors that are rotten. 12. Install new smartcore Monroe oak 5-in wide x 6 1/2 -mm thick waterproof interlocking luxury vinyl plank flooring, or equivalent in price and quality. Color and design must be approved before installation. 13. The contractor shall keep the job site clean and free from an accumulation of debris or materials during the project. At the completion of the work, the entire facility shall be left clean. 14. Contractor must dispose of all demo materials offsite

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents