Similar Projects
2022/2023 Tack Coat
Infrastructure
Bidding
$3,000,000 to $4,000,000 est. value
Philadelphia, PA

Asphalt Pavement Project
Post-Bid
Philadelphia, PA 19141

2021 Milling and Casting Adjustment: 3rd, 5th, and 6th Highway District
Post-Bid
$1,000,000 to $2,000,000 est. value
Philadelphia, PA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Vision Zero General Construction
Results
Philadelphia, PA

PAMT Emergency Sinkhole Repairs
Infrastructure
Post-Bid
Philadelphia, PA 19148

Aspahlt Release Agent
Results
Philadelphia, PA 19102

Head Hadley Septa 1000 Ho Exterior Road
Infrastructure
Post-Bid
Philadelphia, PA

Martin Luther King Junior Drive Trail Improvements
Results
Philadelphia, PA 19131

52nd Street Gateway Project Construction Services
Infrastructure
Post-Bid
Philadelphia, PA 19176

Provide Installation And Abandonment Of Natural Gas Main, Services
Results
Philadelphia, PA

Penndot Superpave Asphalt - 3 Months
Infrastructure
Post-Bid
Philadelphia, PA

Emergency Sewer Excavation Repair and Street Restoration
Term Contract
Results
Philadelphia, PA 19102

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Provide Installation and Abandonment of Natural Gas Main, Services and All Appurtenances and Related Paving
Results
Philadelphia, PA 19019

Last Updated 12/10/2021 04:09 AM
Project Title

Citywide Resurfacing and Ada Ramps 107(City of Philadelphia Bid No. 3904 Ecms) Design-Build Ada Ramps

Physical Address View project details and contacts
City, State (County) PA   (Philadelphia County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,000,000 to $19,999,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for restoring roadway surfaces to fully functional and optimal conditions, to provide smoother riding surfaces for enhanced traffic movement, to install pavement markings for better direction for motorists, bicyclists, and pedestrians and to upgrade non-compliant ADA ramps at crosswalks to current standards. In most cases, pavement restoration in the disturbed areas will match existing pavement types and other miscellaneous construction on various streets in the City of Philadelphia as indicated on the approved drawings included in the bid package for Citywide Resurfacing, Section 107, in Philadelphia County. 4201-0001lump Sum1.000 01nyesaproj Clearing And Grubbing 5` Off The Edge Of Roadway 0203-0001cubic Yard470.000 01nc Class 1 Excavation 0220-0010cubic Yard250.000 01nk1 Flowable Backfill, Type b 0301-0004square Yard1,000.000 01nd Plain Cement Concrete Base Course, 8" Depth 0350-0104square Yard1,000.000 01nc, e Subbase 4" Depth (No. 2a) 0350-0106square Yard1,000.000 01nc, e Subbase 6" Depth (No. 2a) 0413-0245square Yard278,529.000 01nf Superpave Asphalt Mixture Design, Wearing Course, Pg 64s-22, 0.3 To < 3 Million Esals, 9.5 Mm Mix, 1 1/2" Depth, Srl-h 4413-0245square Yard13,565.000 01nyesfproj Superpave Asphalt Mixture Design, Wearing Course, Pg 64s-22, 0.3 To < 3 Million Esals, 9.5 Mm Mix, 1 1/2" Depth, Srl-h , Side Streets Paving 0413-2086ton1,200.000 01nf Superpave Asphalt Mixture Design, Wearing Course (Leveling), Pg 64s-22, 3 To < 10 Million Esals, 9.5 Mm Mix, Srl-h 0413-6047ton80.000 01nf Superpave Asphalt Mixture Design, Binder Course, Pg 64s-22, 0.3 To < 3 Million Esals, 19.0 Mm Mix 0460-0001square Yard292,094.000 01nf4 Asphalt Tack Coat 0491-0019square Yard1,000.000 01nf3 Milling Of Asphalt Pavement Surface, Variable Depth, Milled Material Retained By Contractor 0608-0001lump Sum1.000 03nx Mobilization 0609-0002lump Sum1.000 02nx Inspector`s Field Office And Inspection Facilities, Type a 0609-0009lump Sum1.000 02nxstd Equipment Package 0613-0001cubic Yard200.000 01nc1, h Stone Backfill For Miscellaneous Drainage 0630-0001linear Foot860.000 01nk Plain Cement Concrete Curb 4676-0001square Yard150.000 01nyeskproj Cement Concrete Sidewalk Modified 0688-0020lump Sum1.000 02nx Microcomputer, Type c 0689-0005lump Sum1.000 01nx Cpm Schedule, With Updates 0690-0001dollar1,000.000$1.00$1,000.0006yx Internal Facilitation 0802-0001cubic Yard100.000 01nc1, m Topsoil Furnished And Placed 0804-0011pound10.000 01nm3 Seeding And Soil Supplements - Formula b 0810-0024lump Sum1.000 01nm1 Tree Trimming To An Unlimited Height 0810-0026linear Foot100.000 01nm1 Tree Trimming To a Max Height Of 20` 0901-0001lump Sum1.000 04nqproj Maintenance And Protection Of Traffic During Construction 0901-0320linear Foot35,369.000 01no 4" Standard Pavement Markings, Paint & Beads, Yellow 0901-0330linear Foot98,615.000 01no 4" Standard Pavement Markings, Paint & Beads, White 4937-0300each32.000 01nyesrproj Flexible Delineator Post, Surface-Mount Type Sm-1, White Post With White Sheeting Modified 0945-0001each10.000 01nr Reset Post Mounted Signs, Type f 0960-0002linear Foot63,340.000 01no2 4" Yellow Hot Thermoplastic Pavement Markings 0960-0005linear Foot140,217.000 01no2 6" White Hot Thermoplastic Pavement Markings 0960-0021linear Foot54,917.000 01no2 24" White Hot Thermoplastic Pavement Markings 0960-0022linear Foot2,127.000 01no2 24" Yellow Hot Thermoplastic Pavement Markings 0960-0101each51.000 01no2 White Hot Thermoplastic Legend, "Only", 8` - 0" 0960-0118each163.000 01no2 White Hot Thermoplastic Legend, "Bicycle With Rider", 8` - 0" x 4-0" 0960-0220each5.000 01no2 White Hot Thermoplastic Legend, "Straight Arrow", 12` - 0" x 1` - 8" 0960-0222each5.000 01no2 White Hot Thermoplastic Legend, "Right Arrow", 12` - 0" x 3` - 0" 0960-0224each83.000 01no2 White Hot Thermoplastic Legend, "Left Arrow", 12` - 0" x 3` - 0" 0960-0226each2.000 01no2 White Hot Thermoplastic Legend, "Thru And Right Arrow", 20` - 0" x 3` - 7" 0960-0257linear Foot42.000 01no2 White Hot Thermoplastic Legend, "Yield Line", 24" x 36" Triangle, (Min 4 Triangles Per Line) 0960-1121each32.000 01no2 White Hot Thermoplastic Legend, Shared Lane Marking 0964-0021linear Foot200.000 01no 24" White Epoxy Pavement Markings 9000-0117square Yard100.000 01nkproj Reset Brick Footway Paving 9000-0118square Yard100.000 01nkproj Replace Brick Footway Paving 9000-0131linear Foot100.000 01nkproj Concrete Cheek Wall 9000-0132linear Foot100.000 01nkproj Brick Cheek Wall 9000-0133dollar60,000.000$1.00$60,000.0001yxproj Construct Steps 9000-0134linear Foot100.000 01nj2proj Construct Railing 9000-0135linear Foot100.000 01nkproj Pigmented Concrete Curb 9000-0138square Yard100.000 01nkproj Slate Sidewalk 9000-0139each50.000 01nkproj Reset Sidewalk Cellar Doors And Bilco Doors 9000-0141linear Foot400.000 01nkproj Granite Curb 9000-0152each5.000 01na, m1proj Tree Removal 9000-0324each1.000 07nkproj Replace Pwd Manhole Frame And Cover (Greater Than 36") 9000-0325each241.000 07nkproj Replace Pwd Manhole Frame And Cover (36" And Smaller) 9000-0326each192.000 07nkproj Reset Pwd Manhole Frame And Cover (36" And Smaller) 9000-0327each20.000 07nkproj Reset Pwd Manhole Frame And Cover (Greater Than 36") 9000-0328vertical Foot25.000 07nkproj Rebuild Pwd Manhole 9000-0345each20.000 01nkproj 4` Grate, Bicycle Safe 9000-0346each10.000 01nkproj 6` Grate, Bicycle Safe 9000-0350dollar10,000.000$1.00$10,000.0001ywproj Reimbursement For Testing Of Overhead Catenary - Septa Trolley Lines 9000-0360each50.000 01nkproj Dripstones 9000-0361each20.000 01nkproj Reset Dripstones 9000-0362each20.000 01nkproj Reset City Inlet Top 9000-0363each20.000 01nkproj Reset Open Mouth Grate Inlet Hood 9000-0364each20.000 01nkproj Reset Inlet Frame 9000-0365each20.000 01nkproj Rebuild Inlet 9000-0366each20.000 01nkproj Clean Inlet 9000-0367linear Foot20.000 01nkproj Clean Inlet Connection 9000-0600dollar200,000.000$1.00$200,000.0001yxproj Unforeseen Construction 9000-0633square Yard278,529.000 01nf3proj Milling, Full Width (Material Retained By Contractor) 9000-0637square Yard13,565.000 01nf3proj Milling, Adjustment Area (Material Retained By Contractor) 9000-0651dollar10,000.000$1.00$10,000.0001yc1proj Exploratory Excavation 9000-0709each20.000 01nm2proj Inlet Protection 9000-0790dollar30,000.000$1.00$30,000.0001yxproj Uniform Traffic Control Officers 9000-0791lump Sum1.000 01nxproj Vehicle Removal 9000-0792day730.000 01nxproj Project Vehicle 9000-0861linear Foot500.000 01noproj Plastic Contrast Pavement Markings, 6” White 9000-0862linear Foot500.000 01noproj Plastic Contrast Pavement Markings, 4” Yellow 9000-1230each84.000 07nkproj Replace Pwd Water Valve Frame And Cover 9000-2021each191.000 07nkproj Reset Pwd Water Valve Box 9000-2022each20.000 01nkproj Standard 7-Inch Valve Box Frame And Cover 9000-2073each10.000 01nrproj Relocate Traffic Signs 9000-2078each25.000 01nrproj Covid-19 Safety Plan Sign 9000-2090each1.000 01nkproj Removal Of Existing Police Call Box 9000-2092each10.000 01nkproj Remove Bollard 9000-2093each200.000 01nrproj Traffic Sign, Post Mounted 9000-2094each5.000 01nrproj Traffic Sign, Overhead Mounted 9000-2095each20.000 01nr1proj Remove Traffic Sign Pole Or Post 9000-2630linear Foot100.000 01nkproj Flexible Curb, White 9000-3007each100.000 01nrproj Breakaway Steel Square Post 9000-3015square Yard100.000 01nkproj Latex Modified Concrete Sidewalk Overlay Over Existing Vault 9000-3045each13.000 01no2proj White Hot Thermoplastic Legend, "Bus" 9000-3046square Foot1,000.000 01no2proj Cycle Line Coating 9000-5000each414.000 01nxproj Property Owner Coordination (By Quadrant) 9000-5001each414.000 05nxproj Design Of Ada Ramps (By Quadrant) 9000-5002each365.000 01nkproj Construction Of Ada Ramps (By Quadrant), Concrete 9000-5003each25.000 01nkproj Inspection Of Existing Ada Ramps 9000-5004each1.000 01nkproj Construction Of Ada Ramps (By Quadrant), Pigmented Concrete Ramps With Brick Landings, Flares And Sidewalk Transitions 9000-5005square Foot5,160.000 01nkproj Detectable Warning Surfaces 9000-5006each50.000 01no2proj Preformed Thermoplastic Green Back Bike Legend 9000-5007square Foot5,000.000 01no2proj Green Hot Thermoplastic Pavement Markings 9000-5008each10.000 01no2proj Two Stage Turn Marking Legend 9000-5009each48.000 01nkproj Construction Of Ada Ramps (By Quadrant), Concrete Ramps With Granite Curbs 9000-5010dollar30,000.000$1.00$30,000.0001yxproj Archaeological Monitoring 9000-5011square Foot144.000 01nkproj Construction Of Ada Ban Treatment a - Adding Detectable Grass Strip Area 9000-5012square Foot5,976.000 01nkproj Construction Of Ada Ban Treatment b – Adding Detectable Exposed Aggregate Strip Area 9000-5021lump Sum1.000 01nrproj Public Outreach Postings

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents