Similar Projects
Last Updated | 01/17/2023 09:54 AM |
Project Title | Bridge Rehabilitation With Bridge Deck Overlay, Roadway Lighting, Traffic Signal Improvements, Drainage, Sidewalk Removals on IL 40 |
Physical Address | View project details and contacts |
City, State (County) | Dunlap, IL 61525 (Peoria County) |
Category(s) | Heavy and Highway, Outdoor Lighting, Sewer and Water |
Sub-Category(s) | Bridge, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Request for Qualifications, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $24,657,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bridge Rehabilitation with bridge deck overlay, beam repairs, beam additions, navigation and roadway lighting, traffic signal improvements, drainage improvements, full depth pavement removal and replacement, sidewalk removals, multi-use path construction and related collateral work. Bob Michel Bridge (SN 090-0122) in Peoria and Tazewell Counties on IL 40 (William Kumpf Blvd.) over the Illinois River and Washington Street. Region 3 District 4 Federal Project # NHPP16I9(181) County(s) Peoria Tazewell Key Route(s) FAP 404 Marked Route(s) IL 40 Section(s) 50(BDR,BJR,BRR,L) State Job #(s) C-94-041-20 PPS #(s) 4-09017-3900 Completion Date : November 17, 2023 Plus 15 Working Days Questions not accepted as of November 08, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, October 28, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 028 - Bridge Rehabilitation With Bridge Deck Overlay, Roadway Lighting, Traffic Signal Improvements, Drainage, Sidewalk Removals on IL 40 The work consists of furnishing all labor, materials, equipment, and other incidentals necessary for the completion of microsilica concrete deck overlay, reconfiguring the deck to add a barrier separated multi-use path, bridge deck repair, beam repairs, beam additions, navigation and roadway lighting, traffic signal improvements, drainage improvements, full depth pavement removal and replacement, sidewalk removals, multi-use path construction, and related collateral work necessary to complete the project. The work consists of furnishing all labor, materials, equipment, and other incidentals necessary for the completion of microsilica concrete deck overlay, reconfiguring the deck to add a barrier separated multi-use path, bridge deck repair, beam repairs, beam additions, navigation and roadway lighting, traffic signal improvements, drainage improvements, full depth pavement removal and replacement, sidewalk removals, multi-use path construction, and related collateral work necessary to complete the project. |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |