Similar Projects
Water Production Control Center and Lab
New Construction
Conception
San Angelo, TX 76903

2022 Water Treatment Plant Rehab
Renovation
Conception
Cedar Park, TX

Water Treatment Plant Expansion
Addition
Design
Pflugerville, TX

Steven M. Clouse WRC Primary Clarifier Rehabilitation Project
New Construction
Bidding
$8,569,000 est. value
San Antonio, TX 78221

Water Treatment Plant Filter Air Scour Improvements
New Construction
Bidding
Baytown, TX 77521

Big Sky Estates Phase 1: Water Treatment Facilities
Post-Bid
$3,000,000 est. value
Denton, TX 76201

John Hargrove Environmental Complex (JHEC) Waste Reclamation Facility (WRF) Expansion
Post-Bid
$60,000,000 est. value
Pearland, TX 77584

Rehabilitation of Waste Water Treatment Plant at HC BOF
Results
Houston, TX 77045

Barry Rose WRF Expansion
Results
Less than $60,000,000 est. value
Pearland, TX 77581

DWSRF Phase I WTP Improvements
Construction
$12,500,000 est. value
Millsap, TX

East Side Water Treatment Plant Residuals Handling - Phase 1
Construction
$27,335,500 est. value
Sunnyvale, TX 75182

Liberty Water Production Facility Rehabilitation
Renovation
Pending Verification
Pearland, TX

Magnolia Water Production Facility Rehabilitation
Renovation
Pending Verification
Pearland, TX

Sewer Treatment Plant Expansion
Renovation, Addition
Conception
Katy, TX

Surface Water Treatment Plant Improvements
New Construction
Bidding
$12,500,000 est. value
San Marcos, TX

Last Updated 11/02/2021 10:08 AM
Project Title

Water Plant 2 Upgrades Project

Physical Address View project details and contacts
City, State (County) Fair Oaks Ranch, TX 78015   (Bexar County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work of the Project includes Construction of 9,000 gallon hydropneumatic Tank, two 450-gallon pumps, Variable Frequency Drives, electrical upgrades and minor site improvements.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents