Similar Projects
Utilities - SH 152
Infrastructure
Design
$272,500 CJ est. value
Sayre, OK 73662

Grade, Drain, Bridge and Surface - SH 8
Infrastructure
Design
$9,000,000 CJ est. value
Cherokee, OK 73728

Streets - Milling and Overlay
Infrastructure
Bidding
$270,000 CJ est. value
Durant, OK 74701

Streets - Milling and Overlay
Infrastructure
Bidding
$270,000 CJ est. value
Durant, OK 74701

OK Salt Plains NWR Sandpiper Trail Asphalt Paving
Term Contract
Post-Bid
$50,000 to $100,000 est. value
Jet, OK 73749

2 Road Projects
Infrastructure
Post-Bid
$123,000 est. value
Durant, OK

Pavement Reconstruction
Infrastructure
Results
$1,279,126 est. value
OK

Bridge over Indian Creek
Infrastructure
Results
OK

Stilwell Public Schools Classroom Addition
Addition, Demolition, Infrastructure
Construction
$497,300 CJ est. value
Stilwell, OK 74960

Intersect Modif
Infrastructure
Design
$2,600,000 CJ est. value
Binger, OK 73009

Asphalt Overlays
Infrastructure
Post-Bid
$725,000 est. value
Watonga, OK

Roadway Improvements Broadway/Pioneer & 3rd St/Otis Ave
Infrastructure
Results
Elk City, OK

SH078 - Grade, Draining, Bridge and Surface
Infrastructure, Renovation
Design
$8,548,355 CJ est. value
Calera, OK 74730

RFP D/B - Storm Safe Shelter for Greasy Community
New Construction, Infrastructure
Post-Bid
$150,000 CJ est. value
Bunch, OK 74931

Slabjacking and Subsealing Services
Infrastructure
Results

Last Updated 03/17/2023 04:19 AM
Project Title

Bridge and Approaches - SH 132

Physical Address View project details and contacts
City, State (County) Wakita, OK 73771   (Grant County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh-132: Over Unnamed Creek, 0.35 Miles North of Us-64 Jct As of March 17, 2023, the project is in Conceptual status. Anticipated letting month/year is August, 2023. Length : 0.100 Mi. OKDOT - Bridge and Approaches - SH 132 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents