Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Mayfield Water System Replacement and Road Realignment
Infrastructure
Bidding
$2,200,000 est. value
Silver Creek, WA 98585

Water Main Replacement Phases 2 and 3
Infrastructure
Bidding
Puyallup, WA 98371

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Water Meter Changeout
Infrastructure
Results
WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Pending Verification
Spokane, WA 99218

JBLM North Access Improvement
Infrastructure
Bidding
$12,000,000 est. value
Lakewood, WA

Sedgwick Road Watermain Relocation
Infrastructure
Post-Bid
Port Orchard, WA

Louis Thompson Tightline
New Construction, Infrastructure
Results
$5,800,000 est. value
Sammamish, WA 98074

Miscellaneous COF Upgrades
Infrastructure, Alteration
Bidding
$550,000 est. value
Moses Lake, WA 98837

SR 224 Van Giesen Improvement Phase One
Infrastructure
Post-Bid
West Richland, WA

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

Western Gateway
Infrastructure
Bidding
$2,400,000 to $2,500,000 est. value
Shelton, WA 98584

Last Updated 02/18/2022 09:39 AM
Project Title

Building 2565 Fire Sprinkler System Replacement

Physical Address View project details and contacts
City, State (County) Vancouver, WA 98660   (Clark County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $509,190 to $562,790
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Building 2565 Fire Sprinkler System Replacement Project designs and replaces the existing fire sprinkler system from the backflow device to the system end in the warehouse portion of the 62,000 SF commercial structure. An additive alternate is included for galvanized piping in the warehouse and inspection, system flush and head replacement for the two-story office portion of the building.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents