Similar Projects
Last Updated | 01/22/2020 03:23 PM |
Project Title | Utility Cut Pavement Repairs |
Physical Address | View project details and contacts |
City, State (County) | Salisbury, NC (Rowan County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Utility repair contractor's scope of work begins at Step 3. Step 1: Utility repair on state road is made by City. Step 2: City fills in trench with flowable fill concrete and I-19.0B pavement flush with existing pavement for temporary condition. Step 3: Utility Repair Contractor mobilizes to site and mills out asphalt to 2" depth and to width determined by NCDOT inspector. Step 4: Utility Repair Contractor installs 2" of SF9.5A pavement flush with surrounding asphalt. See attached "Utility Patch Detail". |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |