Similar Projects
Project Indiana / Amazon Fulfillment and Distribution Center
New Construction - 112,104 SF
Conception
$10,000,000 CJ est. value
Arvada, CO 80007

Murphy Express #8904 / Arvada
New Construction, Infrastructure - 2,800 SF
Design
$1,500,000 CJ est. value
Arvada, CO 80002

Pavement Overlay and Construction of Sedimentation Ponds for County Road 170
Infrastructure
Design
$200,000 CJ est. value
Evergreen, CO 80439

Golden Gate Canyon SP - Vault Toilet Replacement
Demolition, New Construction, Infrastructure
Bidding
$250,000 CJ est. value
Golden, CO 80403

Ward TOD Streets/ Intersections
Infrastructure
Bidding
$700,000 CJ est. value
Wheat Ridge, CO 80033

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Maintenance/Shop Facility Projects Design Build Work
New Construction
Post-Bid
Golden, CO 80401

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

D/B Western MATOC
Results
$1,000,000 to $70,000,000 est. value

Murphy Express #8855 / Littleton - Rebid
New Construction, Infrastructure - 2,824 SF
Construction
$1,500,000 CJ est. value
Littleton, CO 80127

Off-Site Garages of Lakewood
New Construction - 126,000 SF
Construction
Lakewood, CO

Rainbow Hill Road Hotel and Commercial
Demolition, New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Evergreen, CO 80439

17200 Colfax Avenue Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Golden, CO 80401

Evergreen Lake North Trail Project
Infrastructure
Design
$400,000 CJ est. value
Evergreen, CO 80439

RFP D/B - Progressive Design-build for Van Bibber Trail and Crossings
Infrastructure
Bidding
$500,000 CJ est. value
Arvada, CO 80403

Last Updated 08/19/2022 04:05 PM
Project Title

RFP Construction Manager - ITS Maintenance Yard - Arvada Project and Coal Creek Project CMGC

Physical Address View project details and contacts
City, State (County) Arvada, CO 80003   (Jefferson County)
Category(s) Commercial, Government/Public, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Misc. Buildings, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $811,080 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified general contractors are invited to submit qualifications for two Construction Manager General Contractor (CMGC) projects. Qualifications for these two projects will be submitted together in a single submittal in STEP I of this RFP. Shortlisted contractors should submit two (2) preconstruction cost proposals for the STEP II of this RFP, one for each project. The two projects will be contracted separately using two Construction Manager/General Contractor Agreements (CMGC) SC 6.5. ITS Maintenance Yard is located on an existing 1.2-acre parcel on Wadsworth Bypass in Arvada. There is an existing pre-engineered metal building and fabric storage structure that will be demolished by CDOT. The project will relocate the CDOT ITS Maintenance staff to this location from Golden. One new building will contain a warehouse with an administrative support space with offices, restrooms, and a break area, and a vehicle storage area for washing trucks and changing oil. The other structure will be an open-air storage structure for the storage of six trucks. Coal Creek VSF Project is located on an existing maintenance site on Coal Creek Canyon Road (Hwy 72) in Jefferson County. There is an existing building that will be demolished by CDOT and an existing sand shed that will remain. The existing gate and site access will remain. The extent of the site work will include the new building, associated utilities and addressing the grading at that building and the sand shed to ensure water drains away from both buildings and down the hill to an existing PWQ structure. Bonding Requirements - Bid Bond 5 % Job Location 6055 Wadsworth Bypass, Arvada, CO Question Acceptance Deadline 07/29/2022 02:00 PM EDT Questions are submitted online No

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Fire Protection Specialties, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents