Similar Projects
Saint Gobain Plant Expansion
Addition
Conception
Ravenna, OH 44266

Kingdom Hall of Jehovah's Witnesses
New Construction, Infrastructure - 3,000 SF
Conception
$1,000,000 CJ est. value
Aurora, OH 44202

Roadway Minor Rehab - SR 43
Infrastructure
Design
$1,434,000 CJ est. value
Kent, OH 44240

Roadway Minor Rehab - SR 43
Infrastructure
Design
$1,434,000 CJ est. value
Kent, OH 44240

Portage County Parking Lot Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Ravenna, OH 44266

Portage County Parking Lot Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Ravenna, OH 44266

Kent State University Airport Runway Design Study
Infrastructure
Post-Bid
$160,000 CJ est. value
Stow, OH 44224

Kent State University Airport Runway Design Study
Infrastructure
Post-Bid
$160,000 CJ est. value
Stow, OH 44224

Chip Seal Work
Infrastructure
Results
Hiram, OH

Chip Seal- D10-Chip Seal FY2022 North
Infrastructure
Results

The Davey Tree Expert Company
Addition - 35,000 SF
Construction
$15,000,000 est. value
Kent, OH 44240

Hamrick Packaging Building
New Construction, Build-Out - 65,000 SF
Construction
$6,800,000 est. value
Kent, OH 44240

Automation Plastics Corp Expansion
Renovation
Pending Verification
$5,800,000 est. value
Aurora, OH 44202

The Kensington at Anna Maria Addition
Addition, Infrastructure - 2,200 SF
Pending Verification
$600,000 CJ est. value
Aurora, OH 44202

Cleveland Avenue (SR 532) Trunk Sewer - Construction - Summit County
Infrastructure
Conception
$1,700,000 CJ est. value
Mogadore, OH 44260

Last Updated 04/03/2023 11:22 AM
Project Title

Route 43 Industrial Building

Physical Address View project details and contacts
City, State (County) Aurora, OH 44202   (Portage County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $11,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 100,000 square foot industrial building. As of May 13, 2022, this project is in the early planning stages, and received recommendation from the Aurora Planning Commission to go on the November 8th ballot. A general contractor has been selected. A firm timeline has not been announced, however, construction is unlikely to begin prior to spring 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

100,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents