Similar Projects
Asphalt Resurface
Infrastructure
Bidding
IN

Construction of the 2021 Round 2 Community Crossings Street Improvements
Infrastructure
Bidding
Osgood, IN

Doughty Road Rehabilitation and Cul-De-Sac Relocation
Post-Bid
Lawrenceburg, IN 47025

Community Crossings Matching Grant (CCMG)
Post-Bid
Petersburg, IN

Community Crossings 2020 Street Repair and Resurfacing
Results
Kouts, IN 46347

CR 525 East Roadway Improvements
Results
Franklin, IN 46131

Asphalt Resurface and Small Structure Paved Invert
Infrastructure
Bidding
IN

Resurfacing County Roads
Post-Bid
Bedford, IN

Asphalt Resurface
Results
IN

Road Reconstruction
Infrastructure
Bidding
IN

2021 Paving
Post-Bid
Carmel, IN

Asphalt Resurface and Small Structure Replacement
Results
IN

2021-2 Community Crossings Project
Infrastructure
Bidding
Upland, IN

2021 Community Crossings Grant Resurfacing
Post-Bid
Kokomo, IN

Concrete Street Repairs
Results
Less than $385,000 est. value
Evansville, IN 47708

Last Updated 02/24/2022 05:05 PM
Project Title

Street Improvements

Physical Address View project details and contacts
City, State (County) Mount Vernon, IN 47620   (Posey County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Item # 1 Asphalt Paving, As Follows: a. Barter St. Ohio St. To West 4 Th St. Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5” Depth & Cleaning 4,217 Syd Patching 4.0” Hma 25.0 Mm Base 36 Ton Tack Furnish & Apply 421 Gal Hma Surface 1.5” Hma 9.5 Mm Surface 366 Ton Stop Bars White Paint Pavement Marking - 24” Wide 5 Each Rr Crossing White Thermoplastic Pavement Marking 2 Each b. Munchoff St. West 2 Nd St. To West 4 Th St. Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5” Depth & Cleaning 2,243 Syd Patching 4.0” Hma 25.0 Mm Base 20 Ton Tack Furnish & Apply 224 Gal Hma Surface 1.5” Hma 9.5 Mm Surface 194 Ton Stop Bars White Paint Pavement Marking - 24” Wide 4 Each c. Nettleton St. West 2 Nd St. To West 4 Th St. Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5” Depth & Cleaning 2,361 Syd Patching 4.0” Hma 25.0 Mm Base 20 Ton Tack Furnish & Apply 235 Gal Hma Surface 1.5” Hma 9.5 Mm Surface 205 Ton Stop Bars White Paint Pavement Marking - 24” Wide 4 Each d. Pearl St. (1) West Water St. To West 4 Th St. Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Transitional Paving Joints 3,573 Syd Wedging Optional Wedgle & Level - 1” Average 30 Ton Tack Liquid Tack Adhesive 356 Gal Hma Surface 1.5” Depth, 9.5 Mm 309 Ton Stop Bars White Paint Pavement Marking - 24” Wide 5 Each e. Pearl St. (2) West 6 Th St. To Deadend Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Transitional Paving Joints 1,002 Syd Wedging Optional Wedge & Level – 1” Average 9 Ton Tack Liquid Tack Adhesive 100 Gal Hma Surface 1.5” Depth 9.5 Mm 87 Ton Stop Bars White Paint Pavement Marking - 24” Wide 5 Each f. e Grant St. Mulberry St. To Harrison Dr. Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5” Depth & Cleaning 2,829 Syd Patching 4.0” Hma 25.0 Mm Base 25 Ton Tack Furnish & Apply 281 Gal Hma Surface 1.5” Hma 9.5 Mm Surface 245 Ton g. Harrison Dr. East Grant St. To East Lincoln Ave Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5” Depth & Cleaning 1,589 Syd Patching 4.0” Hma 25.0 Mm Base 14 Ton Tack Furnish & Apply 158 Gal Hma Surface 1.5” Hma 9.5 Mm Surface 138 Ton Stop Bars White Paint Pavement Marking - 24” Wide 3 Each h. Locust St. Rr Crossing To East Lincoln Ave Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5” Depth & Cleaning 2,109 Syd Patching 4.0” Hma 25.0 Mm Base 19 Ton Tack Furnish & Apply 209 Gal Hma Surface 1.5” Hma 9.5 Mm Surface 183 Ton Stop Bars White Paint Pavement Marking - 24” Wide 5 Each Rr Crossing White Thermoplastic Pavement Marking 1 Each i. Mulberry St. East Lincoln Ave To East 10 Th St. Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5” Depth & Cleaning 3,973 Syd Patching 4.0” Hma 25.0 Mm Base 34 Ton Tack Furnish & Apply 396 Gal Hma Surface 1.5” Hma 9.5 Mm Surface 344 Ton Stop Bars White Paint Pavement Marking - 24” Wide 6 Each j. Barbee St. East 4 Th St. To East 6 Th St. Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5” Depth & Cleaning 1,660 Syd Patching 4.0” Hma 25.0 Mm Base 13 Ton Tack Furnish & Apply 166 Gal Hma Surface 1.5” Hma 9.5 Mm Surface 144 Ton Stop Bars White Paint Pavement Marking - 24” Wide 4 Each k. Everett St. East 4 Th St. To East 6 Th St. Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5” Depth &Cleaning 1,653 Syd Patching 4.0” Hma 25.0 Mm Base 13 Ton Tack Furnish & Apply 165 Gal Hma Surface 1.5” Hma 9.5 Mm Surface 143 Ton Stop Bars White Paint Pavement Marking - 24” Wide 4 Each l. Byrd St. East 4 Th St. To East 6 Th St. Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5” Depth & Cleaning 1,657 Syd Patching 4.0” Hma 25.0 Mm Base 13 Ton Tack Furnish & Apply 166 Gal Hma Surface 1.5” Hma 9.5 Mm Surface 144 Ton Stop Bars White Paint Pavement Marking - 24” Wide 4 Each m. Elm St. East 4 Th St. To Deadend (Past Sycamore St) Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5” Depth & Cleaning 4,738 Syd Patching 4.0” Hma 25.0 Mm Base 43 Ton Tack Furnish & Apply 471 Gal Hma Surface 1.5” Hma 9.5 Mm Surface 411 Ton Stop Bars White Paint Pavement Marking - 24” Wide 9 Each n. Harriett St. East 4 Th St. To East 5 Th St. Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5” Depth & Cleaning 1,097 Syd Patching 4.0” Hma 25.0 Mm Base 10 Ton Tack Furnish & Apply 109 Gal Hma Surface 1.5” Hma 9.5 Mm Surface 95 Ton Stop Bars White Paint Pavement Marking - 24” Wide 2 Each o. Short Sycamore Canal St. To Sawmill St. Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5” Depth & Cleaning 1,435 Syd Patching 4.0” Hma 25.0 Mm Base 13 Ton Tack Furnish & Apply 142 Gal Hma Surface 1.5” Hma 9.5 Mm Surface 124 Ton Summary Of Quantities Qty Unit Mobilization & Traffic Control 15 Each Milling-Full Width & Cleaning 31,561 Sy Milling – Transitional Paving Joints 4,575 Sy Optional Wedge & Level – 1” Avg. 39 Ton Hma Patching – 4” 273 Ton Liquid Tack 3,598 Gal Hma Surface – 1.5” 3,132 Ton Stop Bars-Pavement Marking - 24” Wide 60 Each Rr Crossing-Thermo Pavement Markings 3 Each (Includes 3 Stop Bars, 2 r’s & x)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents