Similar Projects
Glenwood St, Goddard Rd / US 20/26 (Chinden Blvd) - Ada County Highway District
Infrastructure
Conception
$762,000 est. value
Boise, ID

Maple Grove Road and Edna Street Pedestrian Crossing - Ada County Highway District
Infrastructure
Conception
$245,000 est. value
Boise, ID 83704

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Design
$4,181,379 CJ est. value
Boise, ID 83706

Lewiston Regional Office Facility Improvements - Phase II
New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Boise, ID 83702

Dust Abatement Dirt Roads
Term Contract
Post-Bid
Dixie, Elk City, Meridian, ID 83525

Prime Earth Pit Reclamation
Infrastructure
Post-Bid
Eagle, ID 83616

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Widening SH-21 Between MP 0.787 and 3.023
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
ID

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

RFP Design - Design Plans for Pickles Butte Sanitary Landfill Gas Collection Project
Alteration
Conception
Boise, ID

Julia Davis River Node Memorial Construction
Infrastructure
Design
$600,000 CJ est. value
Boise, ID 83702

Spring Valley Phase 1 Grading
Infrastructure
Post-Bid
$300,000 est. value
Eagle, ID

Capital Maintenance Phase Two
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
ID

Idaho Street Mixed-Use Building
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Boise, ID 83702

Last Updated 09/26/2022 07:32 AM
Project Title

Silver Valley Road Safety Improvements

Physical Address View project details and contacts
City, State (County) Silverton, ID 83867   (Shoshone County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of additional delineation, lighting, guardrail, curb/gutter and pavement markings at multiple intersections Please contact the Resident Engineer Kevin Kuther P.e. (Lhtac) AT (208) 344-0565 or kkuther@lthac.org for any design related questions. Est. Value Notes: $250,000 to $500,000 IDOT - Silver Valley Road Safety Improvements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project has been postponed to 09/27/2022 02:00 PM MDT

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents