Tank Inspection and Cleaning
Term Contract, Infrastructure
Results
$45,000 to $55,000 est. value
Reno, NV

Tank Improvements Project
Infrastructure
Results
$1,644,300 to $2,009,700 est. value
Reno, NV

Goni Canyon Tank Rehabilitation Project
Infrastructure
Results
$291,000 est. value
Carson City, NV 89706

Boiler Tank Removal and Heat Exchangers Install
Term Contract
Post-Bid
Nellis AFB, Nellis Air Force Base, NV 89191

Prater Tank Rehabilitation Project
Infrastructure
Results
$1,620,000 to $1,980,000 est. value
Sparks, NV 89434

Zone North Reservoir
Infrastructure
Results
$12,502,906 est. value
Las Vegas, NV

Reported 11/16/2021 12:00 AM
Project Title

Brand Name: Patterson Kelly Boiler Exchange

Physical Address View project details and contacts
City, State (County) Nellis AFB, Nellis Air Force Base, NV 89191   (Clark County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The 99 Civil Engineer Squadron (CES) has a requirement for the removal of one (1) each domestic water storage tank, the installation of two (2) each PK model # D3-801 (brand name only) instantaneous domestic hot water heat exchangers, removal of one (1) each PK W1700VX boiler, installation of one (1) new Patterson Kelly (PK) C2000H (brand name only) boiler with stainless alloy heat engine, creation of a new 3 inch copper piping closed loop heating hot water (HHW) system between the boiler and the heat exchangers with appropriate dielectric connection to the inlet and outlet of the boiler. Installation of one (1) new 10 gallon expansion tank, one (1) each 3-inch flanged air separator, two (2) each inline pumps, installation of Type L hard copper tube domestic side piping, new exhaust vent system AL29-4C SS double-wall, pipe insulation and all required electrical. HHW shall be generated on a closed loop from the new C2000H PK boiler. Provisions shall be made by the contractor for the future addition of one (1) more PK C2000H hot water boiler for backup or redundancy purposes. The existing mixing station shall be abandoned in place. The work covered by this SOW requires the contractor to provide a turnkey solution that includes the furnishing of all labor, materials, supervision, tools, equipment, incidental works and professional design necessary to complete the project. The installation shall be per the manufacturer’s installation instructions. The contractor shall adhere to the most current Building Codes, Regulations, Guidelines, and Industry Standards in the performance of this project. Factory startup and owner training of the equipment to be provided by McCook Boiler & Pump.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents