Similar Projects
Last Updated | 05/09/2022 12:18 AM |
Project Title | Paving 2022 - Paving and Reclaiming |
Physical Address | View project details and contacts |
City, State (County) | Henniker, NH 03242 (Merrimack County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $700,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Paving and reclaiming miscellaneous roads in Henniker.All asphalt depths are measured after compaction. Asphalt emulsion tack to be used and metered at the rate of .025-.030 gallons per square yard per NHDOT spec. before overlaying any asphalt, For quality control measures we are limiting the bid to NH companies, for asphalt paving in the Town of Henniker. Certified traffic control personnel and signage to be provided by the contractor, with the understanding that emergency vehicles and school busses will not be delayed. Covering catch basins and sweeping of road prior to the placement of asphalt will also be the contractor's responsibility. Looting the joints of the asphalt, full width distributor applied tack coat, blending driveways, and mailbox aprons, where required, will be considered as (Machine Method). Contractor will mill and tack all joints at each end of project as well as intersecting side roads. All overlay paving shall be of 3/8" mix and will consist of a 3/4 " + shim and a 1 1/2 " compacted overlay, using two steel drum rollers and one rubber tired pneumatic roller. Base asphalt to consist of 2 1/2 " of 3/4 " NHDOT spec asphalt, 1 1/2 " wear course. All asphalt must meet NHDOT Specs and will be tested. All paving projects must maintain a minimum of 2.5% crown. The town request a price per day to shoulder roads listed after paving is complete. The town will supply gravel loaded on your trucks at the town gravel pit located at 1345 Weare Road. 1. Davison Road: Davison Road from NH Rt.114 to Liberty Hill Road Approx. distance of 5480 feet Shim and overlay 2. Liberty Hill Road: Liberty Hill Road from Western Ave. to intersection of Colby Hill Road approx. distance of 2010 Feet Reclaim and pave. 3. Old Hillsboro Road: Old Hillsboro Road approx. distance of 7550 feet of reclaim and base and 11280 feet of wear course 4. Echo Lane: Echo Lane from Hemlock Loop to barn yard approx. distance of 700 feet very narrow, roughly 16 feet reclaim and pave 5. Baker Road: Baker Road has approx. 1300 feet of pugmill mix, reclaim grade and compact only. 6. Main Street: Main Street approx..700 feet from the joint just beyond Ramsdell Road to the joint just beyond Shed Road, mill and fill and overlay |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |