Similar Projects
Craft State Office Building 1 HVAC Upgrade
Alteration
Bidding
$300,000 est. value
North Platte, NE 69101

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Douglas County Health Center COVID-19 HVAC Upgrades Phase II
Alteration
Results
Omaha, NE 68105

Cooling Tower Repair-Fall 2021
Alteration
Results
Grand Island, NE

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

West Cooling Tower Replacement
Alteration
Results
Louisville, NE

Annual Supply Daiken Heat Pumps
Term Contract
Post-Bid
Lincoln, NE

Elementary Gymnasium HVAC Replacement
Alteration
Results
Louisville, NE 68037

Cooling Tower Repair B451 - Offutt AFB
Term Contract
Post-Bid
Offutt AFB, NE

Theresa Street WRRF A3 Pump Station HVAC, Roof, and Misc. Building Improvements
Renovation, Alteration
Results
Lincoln, NE 68521

557Th Weather Wing (557 Ww) Data Center Temperature Control System Maintenance
Term Contract
Post-Bid
Offutt AFB, NE

Morton Elementary School Multizone Rooftop Unit Replacement
Alteration
Results
Omaha, NE 68130

Westside High School West Campus AHU Replacement - Phase I
Alteration
Post-Bid
Omaha, NE 68144

KPS Central Elementary School DOAS
Alteration
Results
Kearney, NE 68845

Last Updated 06/16/2022 01:20 AM
Project Title

1776 RC HVAC Repairs and Interior Sustainment Phase 2

Physical Address View project details and contacts
City, State (County) Lincoln, NE 68508   (Lancaster County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,097,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will be Phase 2 of a two phase building HVAC sustainment project at the 1776 Readiness Center, Lincoln, NE. Phase 1 Construction was recently completed. The Project for Phase 2 consists of all labor, equipment, tools, materials, travel, licenses and permits to replace the remaining HVAC systems that were not replaced in Phase 1 with matching Variable Refrigerant Flow heating and cooling systems at the main level and second level. The existing heating and cooling systems are to be abandoned in place unless noted in the drawings for removal. The Project also addresses interior finishes and configurations related to the above mentioned renovation work as part of the base bid. The work will take place while not having to displace the current occupants during the work process.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents