Similar Projects
Last Updated | 07/19/2023 09:06 PM |
Project Title | Hot Mix Asphalt Reconstruction and Shoulder Widening for Flex Route, Construction of Crash Sites, Interchange Reconfigurations, Cold Milling and Resurfacing, Bridge Replacement |
Physical Address | View project details and contacts |
City, State (County) | Brighton, MI 48114 (Livingston County) |
Category(s) | Heavy and Highway, Outdoor Lighting, Sewer and Water |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Construction Commenced, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $161,856,518 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 7.46 mi of hot mix asphalt reconstruction and shoulder widening for flex route, construction of crash sites, interchange reconfigurations, cold milling and resurfacing, bridge replacement and bridge rehabilitation of 9 structures including temporary widening, epoxy overlay, substructure and railing patching, concrete surface coating, steel structure coating cleaning and coating and heat straightening, retaining wall, sound wall, ITS equipment, drainage, signing, lighting and pavement markings on US-23 from south of M-36 to Spencer Road, Livingston County. This project includes three 5 year materials and workmanship pavement warranties, a 2 year performance warranty for the concrete surface coating and a 5 year pavement performance warranty for the thin epoxy polymer bridge deck overlay. This project is an OJT VIP project Please see Special provision for Preparation and Consideration of Bids on On-The-Job Training Voluntary Incentive Program Projects. Control Sec Job No Federal No RBMP, NH 47013 210068A 23A0267 M 47014 212528A N/A Net classification required for this project is Comb/Jt. 144690 Cb, Ea In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb and Ea. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. MI DOT - 2303 003 - Hot Mix Asphalt Reconstruction and Shoulder Widening for Flex Route, Construction of Crash Sites, Interchange Reconfigurations, Cold Milling and Resurfacing, Bridge Replacement |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |