Similar Projects
Sewer Improvements - County of Lake
Infrastructure
Conception
$25,000,000 est. value
Crown Point, IN

Bridge over Norfolk Southern
New Construction, Infrastructure
Conception
$5,013,000 CJ est. value
Hammond, IN 46324

Tailor Row
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Hammond, IN 46320

Bid Package #2 - Additions and Renovations to Bibich Elementary - Building Package
Addition, Demolition, Renovation, Infrastructure
Design
$9,434,204 CJ est. value
Dyer, IN 46311

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

West Creek Maintenance Phase II
Infrastructure
Post-Bid
Crown Point, IN

2021 Street Improvements
Infrastructure
Post-Bid
Lowell, IN

Saint John Community Crossing`s Road Improvements
Results
Saint John, IN

Abandoned Coal Mine Restoration
Results
$150,000 est. value

New Administration Center, Alternative Education and Resource Center and Related Work
New Construction, Infrastructure
Construction
$19,869,043 CJ est. value
Crown Point, IN 46307

2022 CCMG Street Improvement Project
Infrastructure
Construction
$1,533,684 CJ est. value
Highland, IN 46322

St. John Commons
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Dyer, IN 46311

Subdivision - Goodwill Store
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Crown Point, IN 46307

Bid Package #3 - Additions and Renovations to Bibich Elementary - Mechanical/Electrical Package
Addition, Demolition, Renovation, Infrastructure
Design
$3,238,550 CJ est. value
Dyer, IN 46311

Last Updated 12/06/2022 05:34 PM
Project Title

Griffith Levee Rehabilitation and Interior Drainage Improvements

Physical Address View project details and contacts
City, State (County) Griffith, IN 46319   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $7,986,716 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 06, 2022, this project has not yet been awarded. It won't be awarded until sometime in january. General Description of Work The above designated work and improvements, referred to as Griffith Levee Rehabilitation and Interior Drainage Improvements, consists of but is not necessarily limited to the following: a. Correcting levee surficial deficiencies b. Constructing a new concrete floodwall at Lafayette Court c. Constructing a stormwater pump station and collection sewer d. Constructing an armored outlet channel with box culvert e. Asphalt milling and paving f. Erosion and sediment control Contractor is encouraged to participate in the MWBE Commission goals as adopted in Resolution Number 2015-04. The work to be performed and the bid to be submitted shall include sufficient and proper sums for all general construction, mechanical installation, labor, materials, permits, licenses, insurance, and so forth incidental to and required for the construction of the facilities. Each bid must be enclosed in a sealed envelope bearing the title of the Project and the name and address of Bidder. All bids must be submitted on the bid forms as identified in the Contract Documents and Specifications. Each bid shall be accompanied by a certified check or acceptable bidder's bond made payable to the Owner, in a sum of not less than ten percent (10%) of the total amount of the highest aggregate bid, which check or bond will be held by the Owner as evidence that the bidder will, if awarded the contract, enter into the same with the Owner upon notification from the Owner to do so within fifteen (15) days of said notification. Approved performance and payment bonds guaranteeing faithful and proper performance of the work and materials, to be executed by an acceptable surety company, will be required of the Contractor at the time of contract execution. The bonds will be in the amount of 100% of the Contract Price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion. The Owner reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make such combination of bids as may seem desirable, and to waive any and all informalities in bidding. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. No bid may be withdrawn after the scheduled closing time for receipt of bids for at least ninety (90) days. A conditional or qualified Bid will not be accepted. Award will be made to the low, responsive, responsible bidder. The low, responsive, responsible bidder must not be debarred, suspended, or otherwise be excluded from or ineligible for participation in federally assisted programs under Executive Order 12549. All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the Project shall apply to the Project throughout. Bids shall be properly and completely executed on bid forms included in the Specifications. Bids shall include all information requested by Indiana Form 96 (Revised 2013) included with the Specifications. Under Section III of Form 96, the Bidder shall submit a financial statement. The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to perform the work and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Agreement and to complete the work contemplated therein. Each Bidder is responsible for inspecting the Project site and for reading and being thoroughly familiar with the Contract Documents and Specifications. The failure or omission of any Bidder to do any of the foregoing shall in no way relieve any Bidder from any obligation with respect to its Bid.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents