Similar Projects
Y1da--Add AHU Metering Louis Stokes VAMC
Design
$1,000,000 to $5,000,000 est. value
Cleveland, OH 44106

Cuyahoga Hills Juvenile Correctional Facility HVAC Replacement
Bidding
$915,000 est. value
Highland Hills, OH 44128

HVAC Technical Services for Forced Air Furnaces
Term Contract
Bidding
Cleveland, OH

Public Auditorium Music Hall Air Handling Units
Post-Bid
Cleveland, OH 44114

King Kennedy North Day Care HVAC Repair or Replacement
Post-Bid
Cleveland, OH 44104

USCG HVAC Maintenance and Repair Ohio
Results
Cleveland, OH 44114

Steam Humidification System Repairs & Replacement of Cooling Tower Fill Project
Results
$250,000 to $500,000 est. value
Cleveland, OH 44113

HVAC Improvements and Upgrades
Post-Bid

HVAC/R Supplies, Items, Materials and Parts
Results
Cleveland, OH 44114

Lubrizol Brecksville - Idea Center Boiler
Renovation
Post-Bid
Brecksville, OH 44141

HVAC System Replacement - City Hall
Results
$550,000 est. value
North Olmsted, OH 44070

RFI Only - NASA Glenn Research Center 9x15 Wind Tunnel Heat Exchanger Bundle Replacement
Post-Bid
Cleveland, OH 44135

HVAC Maintenance Services
Results

HVAC and Mechanical Products
Term Contract
Post-Bid

District-Wide HVAC Equipment and Systems Upgrades (1585)
Results
Less than $5,275,000 est. value
Cleveland, OH 44115

Reported 02/24/2021 12:00 AM
Project Title

The Federal Aviation Administration Logistic Center (FAALC) Requires Drainage Upgrade Around the Cleveland Air Traffic Control Tower Facility and the Replacement of Three Facility Chiller Pumps

Physical Address View project details and contacts
City, State (County) Cleveland, OH 44114   (Cuyahoga County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, equipment, materials, supplies, permits, and transportation required to: - Furnish and install flat canopies. - Furnish and install Zurn Z806-HDG No. 1002 trench drain in existing concrete patio between Air Traffic Control Tower (ATCT) and administrative base building. - Replace concrete slab and curb outside of north ATCT exit door. - Furnish and install trench drain in existing concrete outside of loading dock rollup door. - Replace (2) exterior metal doors and frames (D101A and D102A) on first floor of ATCT with identical metal gauge thicknesses and door types. - Replace floor tile in Exit Stair #1 - Sand, prime and paint bottom of metal stairs in in Exit Stair #1 (room 101) and Exit Stair #2 (room 102) to a height of 12” above floor. Provide 2 coats of finish paint. - Remove temporary insulation on exterior chiller piping and any damaged insulation on chiller pumps. - Contractor shall contract for 40 hour technical support blocks from the local York Chiller technical support office as optional adds for the contract. - Procure 40 hour Authorized Controls Integrator (ACI)

Details

Division 03 - Concrete.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Flooring, Acoustic Underlayment.
Division 10 - Specialties, Protective Covers, Canopies.
Division 22 - Plumbing, Facility Storm Drainage.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Refrigerant Piping, HVAC Air Distribution, Packaged Water Chillers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents