Similar Projects
Demolish Operators Quarters Building
Demolition
Design
$100,000 to $250,000 est. value
Windham, CT 06250

Demolition of Structures at 19 Church Street and 17 North Main Street
Demolition
Bidding
$65,000 est. value
Enfield, CT 06082

Abatement and Demolition of Thames River Apartment Complex
Demolition - 414,000 SF
Post-Bid
New London, CT

Ansonia Building Demo
Demolition
Post-Bid
$500,000 to $1,000,000 est. value
Ansonia, CT 06401

TOD Responsible Growth Grant Phase 1 - Demolition
Demolition
Results
Windsor Locks, CT 06096

Brooksvale Avenue Rear Demolition
Demolition
Results
Hamden, CT 06518

Environmental Remediation and Demolition of Buildings
Demolition, Alteration
Post-Bid
New Britain, CT 06051

Demolition and Abatement of the Old Police Station
Results
Stamford, CT 06905

Building Demolition Services - 590 Newfield Spring Road
Demolition
Post-Bid
$25,000 est. value
Torrington, CT 06790

CEKT192209 Demolish Bldg 11, Bradley ANGB
Demolition
Results
$1,000,000 to $5,000,000 est. value
East Granby, CT 06026

Demolition of Two Buildings - 43 Anson Street and 187-189 Derby Avenue
Infrastructure
Post-Bid
Derby, CT 06418

Demolition of 270 West Thames Street
Demolition
Results
Norwich, CT 06360

Demolition of 922 Winchester Avenue
Demolition
Post-Bid
Hamden, CT 06511

Greenwich Senior Center Demolition of Basement and First Floor Interior Spaces
Demolition
Results
Greenwich, CT 06830

JFK Middle School Additions & Renovations Bid Package #02A-Demolition
Demolition
Post-Bid
Enfield, CT 06082

Reported 07/07/2022 12:00 AM
Project Title

Clough Road Tank Demolition

Physical Address View project details and contacts
City, State (County) Waterbury, CT 06708   (New Haven County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Clarification Deadline 6/23/2022 2:00 PM The Work shall consist of furnishing all labor, equipment, materials, tools, apparatus and all other incidental work required to complete the demolition of the 100,000 gallon water storage tank as specified and shown on the Drawings. The Work shall include, but not necessarily be limited to the following: . Preparation of a written work plan, to describe the methods proposed for construction, and the measures to be implemented for protecting residential properties and for minimizing the impacts of construction operations on the neighborhood. Installation, maintenances, and disposal of all Erosion and Sediment Control Measures, including along the perimeter of the work area and around the soil transfer area. 3. Demolition and legal disposal of the existing 100,000 gallon Water Storage Tank, support structures, and concrete pedestal foundations which are to be saw cut and removed to a minimum depth of 4-inches below the finished grade. 4. Removal and legal disposal of portion of chain link fence within the soil management area. 5. Excavation and legal disposal of soils and materials within the limits of the soil management area to a facility certified to accept lead contaminated soils, as defined in the Drawings on the Soil Management Plan and Disposal of Controlled Materials. Coordination of sampling soils from the excavation base and the soil stockpile is to be performed by LEP. 6. Additional excavation - The depth of final excavation may vary based on the results of laboratory testing. Additional excavation may be required, as directed by the Engineer or LEP. 7. Site restoration including backfilling the excavation, grading the area to allow for proper drainage, and loam and seeding. 8. Providing and installing new chain link fence to replace portion removed prior to soil excavation. 9. Maintenance and repair of all work for a period of one (1) year following the issuance of the Certificate of Substantial Completion. 10. The Work shall also conform to such additional Drawings and addenda to these Specifications and Drawings as may be published or exhibited prior to the opening of bid proposals and to such Drawings in explanation of details, or as may be furnished by the Engineer from time to time during the construction. 11. Work, materials, equipment, and storage areas, which are necessary for construction, but which are not specifically referred to in the Specifications or shown on the Drawings, but implied by the contract, shall be furnished by the Contractor at his own cost and expense, and shall be such as will correspond with the general character of the Work, as may be determined by the Engineer, whose decisions as to the necessity for and character of such work and materials shall be final and conclusive. It is the intent of these Specifications to produce a complete, finished job, whether shown in every detail or not

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents