Similar Projects
Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

Seal Beach Pump Station Replacement - 3-67 - Orange County Sanitation District
Renovation
Bidding
$78,923,000 CJ est. value
Seal Beach, CA 90740

RFQ Engineering - Engineering Services for the Construction of the Temperance Avenue Sewer Trunk Line
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Fresno, CA 93721

Butterfly Valves for Ramona Pipeline Valve Replacement
Infrastructure
Sub-Bidding
$1,500,000 CJ est. value
San Diego, CA 92101

Commercial Industrial Services (CIS) Pumps and Motors Repair
Term Contract
Sub-Bidding
San Diego, CA 92136

As Needed Plumbing Maintenance and Repair for Metropolitan's Eagle Mountain Pumping Plant Housing
Term Contract, Alteration
Post-Bid
$240,000 est. value
Desert Center, Los Angeles, CA 90012

On-Call Plumbing Services
Alteration
Post-Bid

Industrial Water Treatment Services
Alteration
Results
$100,000 est. value
San Diego, CA

As Needed Plumbing Maintenance and Repair for Metropolitan`s Gene Pumping Pump Plant
Term Contract
Results
$240,000 est. value
Los Angeles, CA

Phase 1A Water CIP
Infrastructure
Construction
$1,313,318 CJ est. value
Stockton, CA 95202

Lemoore Sanitary Sewer Lift Station 9
Infrastructure
Bidding
$3,750,000 CJ est. value
Lemoore, CA 93245

California Highway Patrol CHP West Los Angeles Area Office Plumbing Services
Term Contract
Sub-Bidding
Culver City, CA 90230

Architectural Engineering And Related Professional Technical Support Services
Term Contract
Post-Bid
CA

As Needed Plumbing Services
Term Contract
Results
$200,000 est. value
CA

Petaluma River Turning Basin Float, Pile, and Gangway Replacement
Infrastructure
Bidding
$300,000 CJ est. value
Petaluma, CA 94952

Last Updated 07/20/2023 03:09 PM
Project Title

Harbor Patrol Maintenance Shed Renovation

Physical Address View project details and contacts
City, State (County) Santa Barbara, CA 93101   (Santa Barbara County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $94,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 17,2023, bids received were rejected as they were over the budget. Project will rebid but no definite date yet.** The purpose of this project is to supply all necessary labor, materials, and equipment to demolish existing Harbor Patrol shed on a wood dock and replace it with a newly built storage structure per plan specifications. Dock retrofit to be constructed as designed per plan specifications. Liquidated Damages $50/Day The bid exceeds $25,000, the Successful Bidder shall furnish within ten (10) consecutive calendar days after written Notice of Award, a Payment Bond in an amount equal to one hundred percent (100%) of the total amount of the bid as well as a separate Performance Bond in the amount of 100% of the bid total. License Requirements B The estimate is $150,000.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents