Similar Projects
King Street Asbestos Abatement and Demolition Project
Demolition
Post-Bid
Columbia, SC 29201

Henbet and Platt Springs Demolition
Demolition
Post-Bid
West Columbia, SC 29169

Demolition of Campus Buildings per Campus Masterplan
Demolition
Results
$750,000 to $1,000,000 est. value
Spartanburg, SC

Asbestos Abatement and Demolition Services
Demolition
Results
Florence, SC 29501

Removal of Asbestos Materials and Demolish Residential Structure(s)
Demolition
Post-Bid
Spartanburg, SC 29304

Jones PSC Biology Labs Abatement/Demolition
Demolition
Results
$500,000 to $650,000 est. value
Columbia, SC 29208

Carolina Theatre Asbestos Abatement and Demolition Services
Demolition
Post-Bid
Florence, SC

Old Navy Base Housing Demolition
Demolition
Results
Less than $56,000 est. value
North Charleston, SC 29419

STI Replace AHU's 4, 5, VAV's and CWP's
Demolition
Post-Bid
$375,000 to $400,000 est. value
Clemson, SC 29634

Demolish Portable Classroom
Demolition
Results
West Columbia, SC 29169

Demolition and Asbestos Abatement of 4 Structures
Demolition
Post-Bid
Anderson, SC

Dickson Durant Neighborhood Demolition
Demolition
Results
Manning, SC

Sources Sought Notice for Bureau of Indian Affairs (BIA) Demolition Indefinite
Demolition
Post-Bid
$25,000 to $200,000,000 est. value

Hazard Mitigation Grant Program (HMGP) Buyout Program Demolition and Restoration Group 11
Demolition
Results
Columbia, SC 29204

Crooked Creek Tennis / Parking Renovation
Demolition
Post-Bid
Less than $70,000 est. value
Chapin, SC 29036

Reported 04/01/2022 12:00 AM
Project Title

Post Site Visit RFI Demolition of Various Facilities - Shaw AFB

Physical Address View project details and contacts
City, State (County) Shaw AFB, SC   (Sumter County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Historically Underutilized Business (HUBZone) Set-Aside. Contractor’s responsibilities shall include, but not be limited to, the following: 1. Removal and disposal of the building structure, (roof, exterior/interior walls, foundation, footings, grade beams, ceilings, electrical systems, mechanical systems, etc.) 2. Removal and disposal of pavements and sidewalks associated with the facility and/or identified on the plans. 3. Removal of existing slab(s) and associated landscaping. 4. Cutting and capping utilities. a. Provide GPS location of capped or end of cut lines. b. Electric: Remove and dispose of lines to transformer(s). Disconnect buried high voltage lines at transformer(s) and distribution point(s) prior to transformer. Remove and dispose of all disconnected lines above ground and remove and dispose of transformer(s). c. Water: Demolish and cap lines back to the tie in point at the main water line. d. Wastewater: Demolish and cap lines back to the tie in point at the main wastewater line or first junction. 5. Restore site to a neat, professional appearance. a. Backfill excavated areas, fine grade with positive drainage to existing storm drains and provide a six (6) inch layer of clean topsoil. b. Hydro seed entire site. Water as needed until growth is established with no more than one square-foot (1 SF) of a bald area. c. Water until grass is established. d. Repair to pre-existing condition any damaged surrounding areas. e. All loose and visible debris shall be completely removed. 6. Perform destructive asbestos surveys (IAW DHEC regulations). Based on the age of the buildings, it is not expected that asbestos is present. If asbestos is found, abatement will be a modification to this contract. 7. Dispose of all demolition debris. a. Take into account special treatment of hazardous waste as well as the environmental implications related to building demolition management (i.e. mercury and fluorescent lighting tubes, batteries, recapturing refrigerant and quantity annotated mercury thermostats, etc.). b. Contractor shall fill out and submit the refrigerants form to the Government. c. The Contractor shall notify CE at least 72 hours before any refrigerants will be removed d. The Contractor shall recycle eligible materials during demolition.

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents