Similar Projects
Cedar Street and Driftwood Street Improvements
Bidding
Royalton, MN

Grading, Aggregate Base, Bituminous Surfacing, Concrete Curb and Gutter, Concrete Walks, Water Main, Sanitary Sewer, and Related Restoration
Bidding
MN

Inspection and Cleaning of Sanitary and Storm Water Piping
Term Contract
Post-Bid
Moorhead, MN 56563

Phase 3A-2 Infrastructure Improvements
Post-Bid
Tracy, MN

Vincent Avenue North Sanitary and Storm Sewer
Renovation
Results
Minneapolis, MN 55401

Medina Country Club Sewer Rehabilitation
Results
$108,000 est. value
Medina, MN 55340

Bryant Lane Area Improvements
Bidding
Inver Grove Heights, MN 55076

2021 Infrastructure Improvements
Post-Bid
$1,500,000 to $2,000,000 est. value
MN

2020 Stormwater Improvements
Results
Monticello, MN 55362

Eagandale Industrial Park Street and Stormwater Quality Improvements
Bidding
$2,095,000 est. value
Eagan, MN

2021 Storm Sewer Televising Services
Post-Bid
Newport, Oakdale, MN

Pond and Storm Sewer Maintenance
Results
Bloomington, Minneapolis, MN

Replace Bridge L5913
Bidding
MN

Grandview South Area Street and Utility Improvements Improvement
Post-Bid
$9,000,000 to $10,000,000 est. value
Brooklyn Center, MN

Rehab of Twin 42-Inch RCP SS Pipes Under Fieldhouse
Renovation
Results
Less than $1,100,000 est. value
Worthington, MN

Last Updated 04/22/2021 11:58 AM
Project Title

Erickson Park Storm Water Improvements

Physical Address View project details and contacts
City, State (County) Apple Valley, MN   (Dakota County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $410,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1 LS Mobilization 1 LS Traffic Control 1 LS Pond Dewatering 77 EA Clearing 77 EA Grubbing .75 AC Area Clearing 775 SY Remove Bituminous Pavement-Trail 14 SY Remove Bituminous Pavement – Street 40 LF Remove Concrete Curb & Gutter 2100 CY Much Excavation – Management Level 3 3788 CY Common Excavation 20500 SY Site Grading 153 CY Common Excavation (Trail) 315 TON Aggregate Base Class 5 837 CY Clay Pond Liner 350 CY Sand 383 LF Remove Storm Sewer 2 EA Remove Flared End Section 122 LF 18” RCP Storm Sewer Class 5 21 LF 36” RCP Storm Sewer Class 4 66 LF 42” RCP Storm Sewer Class 3 1 EA 72” Dia. Storm MH 1 EA 60” Dia. Storm MH 1 EA 48” Dia. Storm MH 1 EA 48” Dia. Storm MH Deep 1 EA 48” Dia. Pond Outlet Structure 1 EA 48” Dia Outlet Control Structure 4 EA Flared End Section 2 EA SAFL Baffle 20 CY Riprap Class II 60 CY Riprap Class III 3788 CY Common Borrow 142 TON Bituminous Pavement 12 EA Deciduous Tree 2” Caliber 4 EA Coniferous Treet 6’ HT 4081 SY Seeding with Fertilizer and Category 3N Blanket

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents