Similar Projects
Cambridge Senior Living
New Construction - 44,567 SF
Conception
Eau Claire, WI 54701

Outlot 15 Nine Springs
New Construction
Conception
Fitchburg, WI

Primrose at Pleasant Prairie
New Construction
Design
Pleasant Prairie, WI 53158

Congregational Home Residence And Rehabilitation
Addition - 21,044 SF
Design
Brookfield, WI 53005

Port Washington Assisted Living
New Construction - 27,967 SF
Post-Bid
Port Washington, WI

Villa West Green Bay
Renovation
Post-Bid
Green Bay, WI 54304

Aging and Disability Resource Center - Remodel
Renovation
Results
Sheboygan Falls, WI 53085

The Courtyard at Sussex Bid Package 2
New Construction - 103,822 SF
Construction
$10,000,000 CJ est. value
Sussex, WI 53089

Saint Vincent De Paul Homeless Shelter
New Construction
Construction
Fond du Lac, WI 54935

Artis Senior Living of Mequon
New Construction
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Mequon, WI 53092

Journey21
New Construction
Pending Verification
Oconomowoc, WI 53066

Cedar Community
Renovation
Conception
West Bend, WI 53095

Terravessa
New Construction
Design
Fitchburg, WI

Capital Centre West Senior Housing
Renovation - 167,159 SF
Post-Bid
Madison, WI 53703

River Falls Senior Living
New Construction
Pending Verification
$22,000,000 est. value
River Falls, WI 54022

Last Updated 10/13/2021 11:00 AM
Project Title

LaCrosse Home Tomah VA Medical Center

Physical Address View project details and contacts
City, State (County) Tomah, WI 54660   (Monroe County)
Category(s) Residential
Sub-Category(s) Assisted Living Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Tomah VA Medical Center has a requirement for the construction of project 676-328 Donated Lacrosse Home. This work will be completed in two (2) phases. The phases are laid out in work that will allow for major construction without interruption to veterans in phase one. Project duration is 60 days following Notice to Proceed. In Phase 2 project duration is 60 days the work to be completed will be minor construction that will allow for staff and veterans to move into and occupy the living spaces without major interruptions.

Details

Assisted Living Facility, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents