Similar Projects
Town of Randolph, Sterk Road - Const Ops/ Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Cambria, WI 53923

Portage - Fox Lake Const / Pave Replace
Infrastructure
Conception
$8,000,000 CJ est. value
Portage, WI 53901

Hamilton Public Works and Hall
Infrastructure
Design
$4,845,000 CJ est. value
West Salem, WI 54669

Hamilton Public Works and Hall
Infrastructure
Design
$4,845,000 CJ est. value
West Salem, WI 54669

NOI RFP Engineering - Lacrosse - Sparta
Infrastructure
Bidding
$15,000,000 CJ est. value
Sparta, WI 54656

Airdale Avenue Culvert Replacement
Infrastructure
Bidding
$5,000,000 CJ est. value
Fort McCoy, WI 54656

Demolition and Site Clearance of Structures in the Village of Salem Lakes
Demolition, Infrastructure
Sub-Bidding
$30,000 CJ est. value
Salem, WI 53168

Appleton Public Library - BU 11A Loading Dock
New Construction, Infrastructure
Sub-Bidding
$1,800,000 CJ est. value
Appleton, WI 54911

Century Drive Townhouses
New Construction - 73,680 SF
Post-Bid
Wautoma, WI 54982

Hydrants
Infrastructure
Post-Bid
Madison, WI

Grassed Waterway System & Wetland Restoration
Results
Germantown, WI

Waukesha Water Utility - Contract Package 3
Results
Waukesha, WI

Construct Fisheries Equipment Storage Facility
New Construction, Infrastructure
Construction
$587,570 CJ est. value
Oshkosh, WI 54901

Construct Fisheries Equipment Storage Facility
New Construction, Infrastructure
Construction
$587,570 CJ est. value
Oshkosh, WI 54901

RFP Engineering - Perpetuation- Resurfacing STH 83
Infrastructure
Pending Verification
$3,000,000 CJ est. value
Mukwonago, WI 53149

Last Updated 08/09/2022 09:07 AM
Project Title

Crews Continued Installing New Sanitary Sewer South

Physical Address View project details and contacts
City, State (County) Waupaca, WI 54981   (Waupaca County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Crews continued installing new sanitary sewer south of Union St and continued moving south on High St. The crew was slowed down by some rainy weather early in the week and was not able to complete all the sanitary work. Next Monday (6/13) the crew should be able to complete this work and switch over to new water main installation by Tuesday (6/14). New water main installation should take another couple of weeks. No service disruptions are anticipated during the new water main installation. That's because the new water main will be installed next to the old water main. There will be a service disruption in the future when the new water and sewer laterals are installed. The contractor will provide notice before this occurs. As a reminder, water lateral replacement is planned from the main into each home and the sewer laterals will be replaced from the sewer main to the property lines. The Method of Contractor Selection has not been determined at this time.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents