Similar Projects
Cape Girardeau Mechanic & Maintenance Building
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Scott City, MO 63780

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Job Order Contract for Concrete Pavement Repair
Infrastructure
Results
$250,000 to $500,000 est. value

Asphalt Pavement Repairs at Various Locations on I-55, I-57, and I-155 in the SE District
Infrastructure
Results
$100,000 to $250,000 est. value

Saint Francis Medical Center / Miner
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Miner, MO 63801

Job Order Contract for Concrete Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Intersection Improvement at Various Locations in the SE District
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

RFP D/B - New Passenger Terminal Building at the Cape Girardeau Regional Airport
New Construction, Infrastructure - 20,000 SF
Post-Bid
$12,000,000 CJ est. value
Cape Girardeau, MO 63701

High Friction Surface Treatment
Infrastructure
Results
$50,000 to $100,000 est. value
Benton, MO

2022-2023 Asphalt Over Layment on Various County Roads
Infrastructure
Post-Bid
$200,000 CJ est. value
Scott City, MO 63780

Application of Asphalt Pavement to Certain Gravel Streets and Asphalt Overlay to Certain Hard Surface Streets
Infrastructure
Results
$247,294 CJ est. value
Scott City, MO 63780

Last Updated 05/03/2023 12:34 PM
Project Title

Route 55 Scott County. Microsurfacing

Physical Address View project details and contacts
City, State (County) Oran, MO 63771   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,363,613 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contract I.D. 230317-H09 FEDERAL PROJECT NUMBER(S): I 55-1(435) ****(1): Job JSE0166 Route 55 SCOTT County. Microsurfacing from I-57 to Route 77, North and South bound lanes, the total length of improvement being 29.245 miles. All questions concerning this project during the bidding process shall be forwarded to the project contact listed below. Jeff Wachter MoDOT - Southeast District P.O. Box 160 Sikeston, MO 63801 Telephone Number: (573) 472-5294 Cell Number: (573) 258-9679 E-mail: Jeffery.Wachter@modot.mo.gov All questions concerning the bid document preparation can be directed to the Central Office Design at (573) 751-2876. DBE Contract Goal: By submitting this bid, the bidder certifies that the bidder is familiar with the DBE Program Requirements in the General Provisions. The contract goal for the amount of work to be awarded is 0 % Range: 1M to 2.5M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Contract Time: 10/1/23

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents