Similar Projects
The Wilson Apartments
New Construction - 12,120 SF
Design
Albany, NY 12201

Forester Avenue Apartments
New Construction
Design
Warwick, NY 10990

86 Main Street
Renovation - 10,050 SF
Bidding
Saranac Lake, NY 12983

115 Park Street
Renovation - 1,409 SF
Bidding
Tupper Lake, NY 12986

Elevator Rehabilitation and Maintenance and Service for Three(3) Elevators-Ev Package
Renovation
Sub-Bidding
Brooklyn, NY 11238

Salina 1st Mixed-Use Redevelopment
Renovation - 52,000 SF
Post-Bid
$6,800,000 est. value
Syracuse, NY 13202

Main Street Apartments
New Construction - 160,000 SF
Post-Bid
$51,000,000 est. value
Peekskill, NY 10566

Canalside Pocket Neighborhood Project - Developer Services
Results
$1,500,000 est. value
Canastota, NY 13032

Cambray Court Apartments, Phase 2 Renovations
Renovation
Results
Gouverneur, NY 13642

42 Broad Street West - Fleetwood
New Construction - 354,000 SF
Construction
$95,000,000 est. value
Mount Vernon, NY 10550

The Huguenot Multi-Family Building
New Construction - 54,200 SF
Construction
$10,000,000 est. value
New Rochelle, NY 10801

Construction Of A Five (5) Story, Four (4) Unit Multifamily Dwelling
New Construction
Pending Verification
Bronxville, NY 10708

Concern for Independent Living Supported Housing
New Construction - 6,188 SF
Pending Verification
Southampton, NY 11968

Clinton Square Studios
New Construction, Build-Out - 54,946 SF
Design
$24,700,000 est. value
Albany, NY 12207

10 Cliff Avenue
Alteration
Bidding
Tupper Lake, NY 12986

Reported 04/20/2022 03:50 PM
Project Title

Creekside Apartments

Physical Address View project details and contacts
City, State (County) Sandy Creek, NY 13145   (Oswego County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method
Project Status Permitting, Construction Start Expected May 2022, Construction Completion Expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract #1: Site work including but not limited to, storm drainage, asphalt paving and concrete sidewalks. Contract #2: General construction including but not limited to vinyl siding, roofing, windows, interior painting, flooring, kitchen cabinets, as well as upgrades to mechanical, plumbing and electrical systems.

Details

1 Apartments/Condominiums, 1 Story Above Grade, Approximately 15,000 to 20,000 SF Renovation, 20 Unit(s).
Division 00 - Procurement and Contracting Requirements, General Conditions.
Division 01 - General Requirements.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents