Similar Projects
Lakeside At Trappe Master Plan
New Construction
Design
Trappe, MD

WRTP Launder Cover Design
Bidding
Chesapeake Beach, MD 20732

Stevensville Water Treatment Plant
New Construction
Bidding by Invitation
Stevensville, MD 21666

Water Treatment Program
Post-Bid
Princess Anne, MD 21853

Solids Screening at Four Water Resource Recovery Facilities Project
Post-Bid
Damascus, MD

Fair Hill Water System Upgrade
Renovation
Results
Elkton, MD

Water Treatment Services
Term Contract
Results
$13,530 est. value
Kensington, MD 20895

Repair of Steam Sterilization Plant, Fort Detrick, MD
Post-Bid
$25,000,000 to $100,000,000 est. value
Fort Detrick, MD

Fruitland Water System Upgrade - Supply Well and Water Treatment Plant
Results
Fruitland, MD 21826

Patuxent Water Filtration Plant Centrifuge Control Room
Post-Bid
Laurel, MD 20707

Water Treatment Services – Maintenance, Repair and Installation
Results
Annapolis, MD 21401

Water Treatment Service Contract
Post-Bid
College Park, MD 20742

Charlotte Hall Veteran's Home Wastewater Treatment Plant Upgrade Phase II Saint Mary`S County, Maryland
Results
Charlotte Hall, MD 20622

Post-Hypochlorite and Fluoride Monitoring Annapolis Water Treatment Plant
Post-Bid
Annapolis, MD 21401

Broadwater WRF Dewatering Facility Polymer Replacement
Results
$500,000 to $1,000,000 est. value
Churchton, MD 20733

Last Updated 07/06/2020 03:50 PM
Project Title

Multi-Step-Potomac WFP High Zone Pumps 7 and 8 LCI Drives Replacements

Physical Address View project details and contacts
City, State (County) Potomac, MD 20854   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following work to be performed at Potomac Water Filtration Plant: 1. Demolition and replacement of pumps 7 and 8 LCI drives with VFDs 2. Demolition and replacement of pumps 7 and 8 motors 3. Demolition and installation of electrical conduit, wires, and related appurtenances 4. Modification of electrical and control panels 5. Installation of new controls panels 6. Installation of equipment pads.

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Cast-in-Place Concrete, Miscellaneous Cast-in-Place Concrete.
Division 09 - Finishes, Painting.
Division 13 - Special Construction.
Division 22 - Plumbing, Facility Sanitary Sewerage, Sanitary Sewerage Pumps.
Division 26 - Electrical.
Division 40 - Process Integration, Process Control Hardware, Process Control Networks, Fiber Optic Process Control Networks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents