Similar Projects
Widen I-71 From Four to Six Lanes From KY-393
Infrastructure
Conception
$40,000,000 CJ est. value
Crestwood, KY 40014

Old Schoolhouse Lane Subdivision
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
Lexington, KY 40513

Reconstruct Between KY 120 and RR Bridge
Infrastructure
Conception
$1,360,000 CJ est. value
Slaughters, KY 42456

Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
$10,660,000 CJ est. value
Glasgow, KY 42141

Henry Hardin Cherry Hall Renovation - Western Kentucky University
Renovation, Infrastructure
Conception
$30,000,000 CJ est. value
Bowling Green, KY 42101

Address Pavement Condition of PCC Pavement on I-24 Both Direction(S)
Infrastructure
Conception
$6,500,000 CJ est. value
Hopkinsville, KY 42240

Address Pavement Condition of I-75 Non-Cardinal Direction(S)
Infrastructure
Conception
$1,250,000 CJ est. value
Williamstown, KY 41097

Improve KY-207 From the Industrial Parkway to the KY-693 Intersection
Infrastructure
Conception
$32,900,000 CJ est. value
Flatwoods, KY 41139

Improve Safety and Geometrics on I-71 From US-127 to MP 64
Infrastructure
Conception
$37,720,000 CJ est. value
Warsaw, KY 41095

Address Pavement Condition of Julian M. Carroll Purchase Parkway Both Direction(S)
Infrastructure
Conception
$1,750,000 CJ est. value
Fulton, KY 42041

Construct Shelbyhurst Technology Center/Conference Facility - University of Louisville
Renovation
Conception
$20,500,000 est. value
Louisville, KY 40222

Construct Shelbyhurst Technology Center/Office Building - University of Louisville
New Construction, Renovation
Conception
$43,050,000 est. value
Louisville, KY 40222

Improve University of Kentucky Hospital Facilities University Kentucky Chandler Hospital - University of Kentucky
Renovation
Conception
Lexington, KY 40506

Department of Criminal Justice Training New Flat Track - Kentucky Department of Criminal Justice Training
New Construction, Infrastructure
Conception
$13,024,000 est. value
Richmond, KY 40475

Construct Medical/Administration Facilities 2 University of Kentucky Hospital - University of Kentucky
Renovation
Conception
$30,000,000 est. value
Lexington, KY 40506

Last Updated 10/12/2023 07:36 AM
Project Title

UK Grain and Forage Center of Excellence Rebuild / Princeton

Physical Address View project details and contacts
City, State (County) Princeton, KY 42445   (Caldwell County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $22,100,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The new Grain Center allows the University to conduct research on intensive agricultural production practices, to study water quality issues, and to help define the environmental footprint of intensive agriculture. This ultimately benefits Kentucky producers by providing new applications and technologies that result in increased yields, reduced inputs, and higher economic returns. The new facility is a replacement for the newly finished addition/renovation, which opened in 2018. The facility was later destroyed by a tornado in December 2021. The new facility is 52,324 square feet. The space is broken out into 3 areas, learning/education, administration and the lab wings. The building uses modern safety and energy efficiency standards. The Grain Center includes a large multi-purpose space for large events, conference room, smart classrooms, demonstration classrooms, research laboratories, offices for faculty, staff and students, and food preparation rooms. Question Deadline 09/28/2023 at 1:00 PM CT The University of Kentucky, Construction Procurement Section, reserves the right to reject any and all bids and to waive all formalities and/or technicalities where the best interest of the University may be served All bids shall be accompanied by a bid guarantee of not less than five (5%) percent of the amount of the base bid. A 100% Performance Bond and 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instruction to Bidders, General Conditions and Special Conditions The time for substantial completion for all phases shall be Five Hundred Forty (540) consecutive calendar days and Final Completion shall be Thirty (30) consecutive calendar days thereafter. Substantial Completion will include all site restoration completed, site cleanup and fully functional. Project no 202225/XKPR22 BFW Project No: 23025.02

Details

52,324 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents