Similar Projects
Jackson Creek Road Improvements
Term Contract
Design

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Chip Seal E Frontage Road SE Of Dutton Airport Great Falls Area
Infrastructure
Post-Bid
Belgrade, MT 59714

Headwaters Trail System Jefferson Street Connection - 2021
Infrastructure
Results
Three Forks, MT 59752

Headwaters Trail System Crack Seal and Seal Coat - 2021
Infrastructure
Results
Three Forks, MT 59752

Seal and Cover, Guardrail, Pavement Markings on the Three Forks
Infrastructure
Post-Bid
MT

Hudson Bay Divide South
Infrastructure
Results

Scrub Seal VC Hill Bozeman Area
Alteration
Post-Bid
Bozeman, MT

Overlay and Chip Seal Madison Frontage Road and Two Dog Road Bozeman Area
Infrastructure
Results
Silver Star, MT 59751

Scrub Seal Big Sky South Bozeman Area
Alteration
Post-Bid
Bozeman, MT

Overlay and Chip Seal Frontage Rd W of Columbus Billings Area
Infrastructure
Results

Overlay and Chip Seal Lodgepole Road Kalispell Area
Alteration
Post-Bid

Scrub Seal Hwy 10 E Se of Greycliff Interchange Billings Area
Infrastructure
Results

GAOA Jackson Creek Road Improvements
Infrastructure
Post-Bid
$250,000 to $500,000 est. value
Bozeman, MT

Chip Seal Dry Creek Rd Belgrade and Dry Creek Rd Manhattan Bozeman Area
Infrastructure
Results
Belgrade, MT 59714

Last Updated 06/16/2022 12:35 AM
Project Title

2022 Gallatin County RID Paving and Road Maintenance Project

Physical Address View project details and contacts
City, State (County) Bozeman, MT   (Gallatin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of work within the following Rural Improvement Districts: RID 314 - Middle Creek No. 3, 1 1/2 " Asphalt Overlay RID 2602 - Garden Center, 1 1/2 " Asphalt Overlay RID 318 - Big Sky Meadow Village, 1 1/2 " Asphalt Overlay RID 324 - Glacier Condominiums, 1 1/2 " Asphalt Overlay o RID 327 - Silver Bow Condos No. 1, 1 1/2 " Asphalt Overlay RID 328 - Silver Bow Condos No. 2, 1 1/2 " Asphalt Overlay RID 395 - Ousel Falls Misc. Road Improvements o RID 395 - South Fork Misc. Road Improvements RID 395 - Ousel Falls, Traffic Control Marking and Striping RID 397 - Firelight Phase 1, Curb & Striping RID 2605 - Firelight Meadows Condos, Striping RID 378 - Big Sky Meadows Subdivision

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents