Similar Projects
Jones Hall Renovation
Renovation
Conception
Canyon, TX 79016

Shirley Hall Renovation
Renovation
Conception
Canyon, TX 79015

Dorms Reno/Repair
Renovation - 53,000 SF
Design
$25,000,000 to $100,000,000 est. value
TX

UT Graduate Student Housing
New Construction - 424,341 SF
Design
$70,000,000 est. value
Austin, TX 78722

Building 255 Dormitory Renovation/Repair
Renovation - 53,000 SF
Bidding
$25,000,000 to $100,000,000 est. value
Del Rio, TX 78843

AXO Zeta Nu Renovation - TAMU
Renovation, Addition - 14,658 SF
Post-Bid
College Station, TX 77840

Texas A&M San Antonio Housing Phase II
New Construction - 105,000 SF
Post-Bid
$32,500,000 est. value
San Antonio, TX 78224

Unaccompanied Enlisted Personnel Housing (UEPH) Facilities at Fort Hood
New Construction - 93,750 SF
Results
$25,000,000 to $100,000,000 est. value
Fort Hood, TX 76543

Maintenance Restroom Renovation Kinsolving Dormitory
Renovation
Results
$3,447,400 est. value
Austin, TX

Criswell College Student Housing
New Construction - 60,750 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Dallas, TX 75246

Green Oaks School Dormitory
New Construction
Construction
$1,000,000 to $5,000,000 CJ est. value
Arlington, TX 76011

Texas A&M Commerce New Honors College Living/Learning Residence Hall
New Construction
Conception
Commerce, TX 75428

Student Housing Facilities
New Construction
Post-Bid
Weatherford, TX

Renovations of Two Dorms at Giddings State School
Renovation
Results
$374,000 est. value
Giddings, TX 78942

Hammerhead Barracks Renovation at Fort Hood, TX
Renovation
Construction
$25,000,000 to $100,000,000 est. value
Fort Hood, TX 76102

Last Updated 06/24/2022 11:02 AM
Project Title

Hammerhead Barracks Renovation at Fort Hood, Texas

Physical Address View project details and contacts
City, State (County) Fort Hood, TX   (Bell County)
Category(s) Residential
Sub-Category(s) Dormitory
Contracting Method Competitive Bids.
Project Status Construction Commenced February 2021, Construction Start Expected February 2021, Construction Completion Expected June 2023, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Background / Scope Summary: This project will revitalize/renovate five existing Hammer Head Barracks (B10009, B10010, B10011, B10016, B10018) and One Central Energy Plant (CEP B10017) at Fort Hood, TX. Each barracks building is 3-Stories, a basement, and includes Company Operations Facilities that contain two arms vaults and chemical room (Gas Mask and similar equipment). Renovations will include: Standing Seam Metal Roofs, Exterior Finishes/EIFS, Interior Finishes(Walls/Ceilings/Floors), New Barracks Floor Plans (2 Bedrooms, 1 Kitchen, 1 Common Area, and 1 Bathroom), New HVAC Systems (Chillers and Cooling Towers for CEP, DOAS, Hydronic Boilers, Fan Coil Units), Plumbing Systems, Fire Protection Systems, Lighting & Electrical Systems, Telecommunication Systems, and Site Improvements (Drainage, Roadway/Sidewalk Upgrades, Utility Upgrades: Electrical, Sanitary Sewer, Domestic Water, and Natural Gas). There are no LEED requirements. Project Labor Agreement: A Project Labor Agreement (PLA) is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). Federal Acquisition Regulation (FAR) 22.503 Policy provides that: (a) PLAs are a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 13502, agencies are encouraged to consider requiring the use of project labor agreements in connection with large-scale construction projects. (b) An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will: (1) Advance the Federal Governments interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and (2) Be consistent with law. Reference: Provision: 52.222-33 Notice of Requirement for Project Labor Agreement Clause 52.222-34 Project Labor Agreement. Some of the factors that may be considered regarding their use are: a.) The involvement of multiple contractors and/or subcontractors working in multiple crafts or trades. b.) The complexity of the project. c.) Shortage of skilled labor in the region. d.) Completion of the project will require an extended period of time. e.) The use of PLA's on other comparable projects. f.) The promotion of the Governments long term programs interests such as training of skilled workforce for future projects. g.) The possibility of labor disputes that threaten timely completion. h.) Additional costs from use of PLAs may be cost prohibitive.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents