Similar Projects
Ulta Beauty at Target #1298
Renovation - 1,000 SF
Design
Bluffton, SC 29910

Seafood Market
New Construction, Demolition - 2,180 SF
Design
$500,000 to $1,000,000 CJ est. value
Hilton Head Island, SC 29926

Walmart 0-2--TENANTBID--2021 - Bundle #2
Renovation
Post-Bid

Sunglass Hut #6133
Renovation - 849 SF
Post-Bid
Bluffton, SC 29910

New Riverside Village - Phase 1
New Construction
Construction
Bluffton, SC

AutoZone #1700
Renovation - 8,400 SF
Construction
Hilton Head Island, SC 29928

Okatie Retail Center
New Construction, Infrastructure - 9,911 SF
Pending Verification
$3,000,000 CJ est. value
Okatie, SC 29909

De Maket Mixed-Use
New Construction, Infrastructure - 3,985 SF
Pending Verification
$1,000,000 CJ est. value
Bluffton, SC 29910

Walmart Supercenter #728-277 - Smart Bundle
Renovation - 148,321 SF
Design
Hilton Head Island, SC 29926

Greg Norman Collection
Renovation - 2,700 SF
Post-Bid
Bluffton, SC

Walmart Supercenter #6395-214 - OGP
Renovation - 850 SF
Construction
Less than $85,410 est. value
Bluffton, SC 29910

Petsmart
Build-Out - 17,073 SF
Design
Beaufort, SC 29906

Walmart Supercenter #1383-608 - CAPXHVAC-1
Renovation
Post-Bid
Beaufort, SC 29906

CVS #4489
Renovation - 10,111 SF
Construction
$209,000 est. value
Bluffton, SC 29910

Homegoods
Build-Out - 24,236 SF
Design
Beaufort, SC 29906

Last Updated 08/18/2022 10:13 AM
Project Title

Billy Wood Appliance

Physical Address View project details and contacts
City, State (County) Hilton Head Island, SC 29926   (Beaufort County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $75,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 18 2022 this project i sin late planning and will be exterior renovation to the front and right sides. The application will be heard on August 23, 2022 by Hilton Head Design Review commission. Information regarding contractor has yet to be determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents